IAAAP Administrative Record, required by the Code of Federal Regulations, is a compilation of documents that track the discovery, investigation and remedy selection for environmental clean-up activities. It also provides a mechanism for public participation. The documents contained in the Administrative Record were used as the basis for the selection of a response action. All hard copies of the Administrative Record reside at the installation. For a complete list of every document, download the Administrative Record Index – OCT 2022. You can also download a description of the CERCLA Phases.
1--ALL--Federal Facilities Agreement--SEP1990
2.0--ALL--Community Relations Plan--MAY1991
2.1--ALL--Community Relations Plan Update--FEB2001
2.2--ALL--Community Involvement Plan Addendum FUSRAP Areas--FEB2011
2.3--ALL--Community Relations Plan Update--SEP2011
2.4--ALL--Community Involvement Plan--MAY2017
3--ALL--ATSDR Public Health Assessment Note of Explanation--DEC1999
4--ALL--ATSDR Health Consultation Note of Explanation--MAR2001
5--ALL--ATSDR Health Consultation Environmental Pathway Evaluation--DEC2003
Preliminary Assessments (PA)
100--PA--Installation Assessment--JAN1980
102--PA--Contamination Geo-technical Reports--SEP1982
102--PA--Appendices
1000.01--PA--Petroleum Leak Spill Area Final Assessment--MAR1990
1000.1--PA--Replace Upgrade Explosives Collection Sumps Study--DEC1990
108--PA--Potential Areas Concern Supplement--MAY1991
109--PA--News Release--AUG1991
110--PA--Conceptual Program Plan--SEP1991
111--PA--Technical Review Committee Minutes--MAY1993
112--PA--Preliminary Assessments for 43 IAAAP Sites--OCT1994
113--PA--Installation Environmental Assessment--OCT1995
Site Inspections (SI)
200--SI--Sampling and Analysis Plan Vol 2 Field Sampling Plan--JUN1991
201--SI--Sampling and Analysis Plan Vol 1 Quality Assurance Project Plan--JUL1991
2002--SI--Site Inspection--JUN1992
203--SI--Preliminary Site Characterization Reports--MAR1993
204--SI--Site Characterization Report R01--MAR1993
205--SI--Site Characterization Report R02 R03--MAR1993
206--SI--Site Characterization Report R04-R11--MAR1993
207--SI--Site Characterization Report R12-R21--MAR1993
208--SI--Site Characterization Report R22-R30--MAR1993
209--SI--Site Assessment Project Plans--JUN2000
210--SI--Field Sampling Report--FEB2001
Remedial Investigations (RI)
300--RI--Endangerment Assessment Line 1 Impoundment Line 800 Lagoon 1 of 2--JUL1989
300--RI--Endangerment Assessment Line 1 Impoundment Line 800 Lagoon 2 of 2--JUL1989
301--RI--Risk Assessment Protocol--OCT1992
1000.2--RI--Contamination Assessment of Concrete Sumps--JUN1993
1000.3--RI--Engineering Evaluation Cost Analysis-Pesticide Pit Removal--OCT1994
1000.4--RI--Engineering Evaluation Cost Analysis-Explosive Contaminated Sumps--OCT1994
303--RI--Field Sampling Plan Addendum--MAR1995
306--RI--Risk Assessment-1of21-MAY1996
306--RI--Risk Assessment-2of21-MAY1996
306--RI--Risk Assessment-3of21-MAY1996
306--RI--Risk Assessment-4of21-MAY1996
306--RI--Risk Assessment-5of21-MAY1996
306--RI--Risk Assessment-6of21-MAY1996
306--RI--Risk Assessment-7of21-MAY1996
306--RI--Risk Assessment-8of21-MAY1996
306--RI--Risk Assessment-9of21-MAY1996
306--RI--Risk Assessment-10of21-MAY1996
306--RI--Risk Assessment-11of21-MAY1996
306--RI--Risk Assessment-12of21-MAY1996
306--RI--Risk Assessment-13of21-MAY1996
306--RI--Risk Assessment-14of21-MAY1996
306--RI--Risk Assessment-15of21-MAY1996
306--RI--Risk Assessment-16of21-MAY1996
306--RI--Risk Assessment-17of21-MAY1996
306--RI--Risk Assessment-18of21-MAY1996
306--RI--Risk Assessment-19of21-MAY1996
306--RI--Risk Assessment-20of21-MAY1996
306--RI--Risk Assessment-21of21-MAY1996
311--RI--Work QA Plan Eco Risk Assessment Addendum--JUL1997
315--RI--Historical Eco Risk Assessment Addendum--MAR1998
324--RI--Modification to the SAP Eco Assessment--APR2000
325--RI--Eco Risk Round 2 Sampling--SEP2000
327--RI--Eco Risk Assessment Screening Level--APR2001
330--RI--Bio-remediation Metals Treatment WBPLF Soil Work Plan--JUL2001
332--RI--Development of Dose Est Models and Toxicity Eco--AUG2001
333--RI--Screening Level Risk Assessment Eco-text-appendixA--AUG2001
333--RI--Screening Level Risk Assessment Eco-appendixB-J--AUG2001
337--RI--Bio-remediation Metals Treatment WBPLF Soils Supplemental Work Plan--AUG2001
1000--RI--Work Plan for Supplemental RI for Line 1 and Firing Sites 1-of-11--SEP2001
1000--RI--Work Plan for Supplemental RI for Line 1 and Firing Sites-2-of-11--SEP2001
1000--RI--Work Plan for Supplemental RI for Line 1 and Firing Sites-3-of-11--SEP2001
1000--RI--Work Plan for Supplemental RI for Line 1 and Firing Sites-4-of-11--SEP2001
1000--RI--Work Plan for Supplemental RI for Line 1 and Firing Sites-5-of-11--SEP2001
1000--RI--Work Plan for Supplemental RI for Line 1 and Firing Sites-6-of-11--SEP2001
1000--RI--Work Plan for Supplemental RI for Line 1 and Firing Sites-7-of-11--SEP2001
1000--RI--Work Plan for Supplemental RI for Line 1 and Firing Sites-8-of-11--SEP2001
1000--RI--Work Plan for Supplemental RI for Line 1 and Firing Sites-9-of-11--SEP2001
1000--RI--Work Plan for Supplemental RI for Line 1 and Firing Sites 10-of-11--SEP2001
1000--RI--Work Plan for Supplemental RI for Line 1 and Firing Sites 11-of-11--SEP2001
338--RI--Addendum to Screening Level Risk Assessment Eco--DEC2001
339--RI--AO Construction Projects Sampling Work Plan 1of2--JAN2002
339--RI--AO Construction Projects Sampling Work Plan 2of2--JAN2002
342--RI--Technical Memos 1-4 for the Eco Risk Assessment--APR2002
343--RI--Work Plan Addendum Metals Treatment WBPLF Soils--AUG2002
1001--RI--Supplemental RI for Line 1 and Firing Site (text)--AUG2002
1001--RI--Supplemental RI for Line 1 and Firing Site (figures)--AUG2002
1001--RI--Supplemental RI for Line 1 and Firing Site (tables)--AUG2002
1001--RI--Supplemental RI for Line 1 and Firing Site (appendix A-B)--AUG2002
1001--RI--Supplemental RI for Line 1 and Firing Site (appendix C)--AUG2002
1001--RI--Supplemental RI for Line 1 and Firing Site (appendix D)--AUG2002
1001--RI--Supplemental RI for Line 1 and Firing Site (appendix E-F)--AUG2002
1001--RI--Supplemental RI for Line 1 and Firing Site (appendix G1)--AUG2002
1001--RI--Supplemental RI for Line 1 and Firing Site (appendix G2)--AUG2002
1001--RI--Supplemental RI for Line 1 and Firing Site (RTC)--AUG2002
344--RI--Aerial Radiation Survey Work Plan--OCT2002
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-1-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-2-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-3-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-4-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-5-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-6-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-7-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-8-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-9-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-10-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-11-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-12-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-13-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-14-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-15-of-15--MAR2003
346--RI--Aerial Radio-logical Survey--JUL2003
348--RI--Work Plan for UXO Survey LL6 and CTA 1 of 3--MAY2004
348--RI--Work Plan for UXO Survey LL6 and CTA 2 of 3--MAY2004
348--RI--Work Plan for UXO Survey LL6 and CTA 3 of 3--MAY2004
349--RI--Technical Memo 5 BERA--JUL2004
349.1--RI--Soil Data Collection Work Plan 1of2--JUL2004
349.1--RI--Soil Data Collection Work Plan 2of2--JUL2004
1002.1--RI--HRR for L6-800-CTA-Deact Furnace 1of6--SEP2004
1002.1--RI--HRR for L6-800-CTA-Deact Furnace 2of6--SEP2004
1002.1--RI--HRR for L6-800-CTA-Deact Furnace 3of6--SEP2004
1002.1--RI--HRR for L6-800-CTA-Deact Furnace 4of6--SEP2004
1002.1--RI--HRR for L6-800-CTA-Deact Furnace 5of6--SEP2004
1002.1--RI--HRR for L6-800-CTA-Deact Furnace 6of6--SEP2004
350--RI--BERA-Vol-I-and-II-1of2--OCT2004
350--RI--BERA-Vol-I-and-II-2of2--OCT2004
352--RI--L6-CTA Mec Density Survey Report 1of2--MAY2005
352--RI--L6-CTA Mec Density Survey Report 2of2--MAY2005
353--RI--Soil Data Collection Report 1of6--MAY2005
353--RI--Soil Data Collection Report 2of6--MAY2005
353--RI--Soil Data Collection Report 3of6--MAY2005
353--RI--Soil Data Collection Report 4of6--MAY2005
353--RI--Soil Data Collection Report 5of6--MAY2005
353--RI--Soil Data Collection Report 6of6--MAY2005
1003--RI--Line 7 Post Demo Soil Sampling Work Plan--JAN2006
356--RI--Supplemental RI Work Plan 1of4--MAY2006
356--RI--Supplemental RI Work Plan 2of4--MAY2006
356--RI--Supplemental RI Work Plan 3of4--MAY2006
356--RI--Supplemental RI Work Plan 4of4--MAY2006
357.1--RI--Brush Creek SW and Sediment Investigation Work Plan--FEB2006
357--RI--Comprehensive Watersheds Evaluation Work Plan 1of3--DEC2006
357--RI--Comprehensive Watersheds Evaluation Work Plan 2of3--DEC2006
357--RI--Comprehensive Watersheds Evaluation Work Plan 3of3--DEC2006
1004--RI--FUSRAP RI REPORT 1 of 6--JUL2008
1004--RI--FUSRAP RI REPORT 2 of 6--JUL2008
1004--RI--FUSRAP RI REPORT 3 of 6--JUL2008
1004--RI--FUSRAP RI REPORT 4 of 5--JUL2008
1004--RI--FUSRAP RI REPORT 5 of 6--JUL2008
1004--RI--FUSRAP RI REPORT 6 of 6--JUL2008
502--RI—Executive Summary Uniform Federal Policy-Quality Assurance Project Plan Packet 1—DEC2017
Feasibility Study (FS)
400--FS--Soil Focused Feasibility Study--MAY1997
402--RI--Soils Feasibility Study Report--JUN1998
Proposed Plan (PP)
500--PP--Focused Soils Proposed Plan - Applies to IROD--MAY1997
1005--PP--Soils Proposed Plan - Applies to ROD--JUN1998
1005.1--PP--Soils Public Meeting Notice - Applies to ROD--JUN1998
1006--PP--Public Meeting Transcript--JUL1998
Record of Decision (ROD)
1006.1--ROD--Action Memorandum for the Pesticide Pit--MAR1995
1006.2--ROD--Action Memo for Explosive Contaminated Sump Removal--NOV1995
1006.3--ROD--Action Memo for Line 800 Pink Water Lagoon and Line 1 Impoundment--OCT1996
1006.4--ROD--Explanation of Significant Difference and Action Memorandum for the Fire Training Pit--DEC1997
1007--ROD--OU1 Interim Action Record of Decision--MAR1998
1008--ROD--OU1 Record of Decision--AUG1998
1009--ROD--Explanation of Significant Difference for the OU1 Record of Decision--JAN2003
1010--ROD--Explanation of Significant Difference for OU1 IROD--JUN2006
1010.1--ROD--ESD for OU1 IROD--JUN2008
1011--ROD--Public Notice-Alkaline Hydrolysis ESD--AUG2009
1012--ROD--ESD for OU1 ROD--SEP2009
1013--ROD--ESD for OU1 ROD--MAR2011
1014--ROD--Public Notice-ESD-Barium--MAR2011
1045—ROD—OU1 ESD—OCT2018
1046—ROD—Public Notice–OU1 ESD—NOV2018
Remedial Design/Remedial Action (RD/RA)
1015 Revised Work Plan & Revised Contractor Quality Control Plan (May 1998)
1023 Remedial Action Report Focused FS Sites Phase 1 (Oct 2000)
1032 Final Remedial Action Report Focused FS Sites Phase 2 (Apr 2001)
1038. Proposed Excavations for L3 & L3A
1044 O&M PLAN - Line 1 & 800 signed
Explanation of Significant Differences (ESD)
1045 EXPLANATION OF SIGNIFICANT DIFFERENCES Final_09-28-18_CLEAN
Preliminary Assessments (PA)
102--PA--Contamination Geo-technical Reports--SEP1982
102--PA--Contamination Geo-technical Reports (drawings)--SEP1982
111--PA--Technical Review Committee Minutes--MAY1993
Remedial Investigation (RI)
301--RI--Risk Assessment Protocol--OCT1992
3000--RI--Action Memo for Offpost Rathbun Hookup--JUL1993
3001--RI--Public Meeting Transcript for Offpost Rathbun Connection--AU1993
302--RI--BHHERA for Former Line 1 Impoundment and Line 800 Lagoon 1of2--JUN1994
302--RI--BHHERA for Former Line 1 Impoundment and Line 800 Lagoon 2of2--JUN1994
306--RI--Risk Assessment--MAY1996
313--RI--Quality Control Summary Report Supplemental Groundwater RI--JAN1998
321--RI--LTM Events Fall 99-Spring 00 Work Plan Addendum--NOV1999
3002--RI-- Tech Memo Supplemental Investigation for Offsite Groundwater, Surfacewater and Sediment--JAN2000
323--RI--LTM Event Spring 2000 Work Plan Addendum--APR2000
328--RI--Tech Memos Fate and Transport of Contaminants and Evaluation--JUL2001
3003--RI--2001 Action Memo Addendum for Permanent Water--JUL2001
3004--RI--Offsite Groundwater RI Work Plan Addendum--AUG2001
334--RI--Supplemental Groundwater RI Report 1of5--AUG2001
334--RI--Supplemental Groundwater RI Report 2of5--AUG2001
334--RI--Supplemental Groundwater RI Report 3of5--AUG2001
334--RI--Supplemental Groundwater RI Report 4of5--AUG2001
334--RI--Supplemental Groundwater RI Report 5of5--AUG2001
335--RI--Groundwater Monitoring Program--AUG2001
336--RI--Fall 2000 Spring 2001 Groundwater Monitoring Results Summary--AUG2001
340--RI--Facility Wide Work Plan for Groundwater--FEB2002
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 1of6--FEB2002
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 2of6--FEB2002.
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 3of6--FEB2002
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 4of6--FEB2002
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 5of6--FEB2002
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 6of6--FEB2002
3005--RI--Offsite Monitoring Well and Staff Gauge Photo Log--DEC2002
347--RI--2002 Groundwater Monitoring Report 1of5--AUG2003
347--RI--2002 Groundwater Monitoring Report 2of5--AUG2003
347--RI--2002 Groundwater Monitoring Report 3of5--AUG2003
347--RI--2002 Groundwater Monitoring Report 4of5--AUG2003
347--RI--2002 Groundwater Monitoring Report 5of5--AUG2003
351--RI--2003 Groundwater Monitoring Report 1of5--DEC2004
351--RI--2003 Groundwater Monitoring Report 2of5--DEC2004
351--RI--2003 Groundwater Monitoring Report 3of5--DEC2004
351--RI--2003 Groundwater Monitoring Report 4of5--DEC2004
351--RI--2003 Groundwater Monitoring Report 5of5--DEC2004
354--RI--2004 Groundwater Monitoring Report 1of4--JUL2005
354--RI--2004 Groundwater Monitoring Report 2of4--JUL2005
354--RI--2004 Groundwater Monitoring Report 3of4--JUL2005
354--RI--2004 Groundwater Monitoring Report 4of4--JUL2005
355--RI--2004-2005 Groundwater Sampling Report 1of5--DEC2005
355--RI--2004-2005 Groundwater Sampling Report 2of5--DEC2005
355--RI--2004-2005 Groundwater Sampling Report 3of5--DEC2005
355--RI--2004-2005 Groundwater Sampling Report 4of5--DEC2005
355--RI--2004-2005 Groundwater Sampling Report 5of5--DEC2005
357.1--RI--Brush Creek Surface Water and Sediment Investigation Work Plan--FEB2006
357--RI--Comprehensive Watersheds Evaluation Work Plan 1of2--DEC2006
357--RI--Comprehensive Watersheds Evaluation Work Plan 2of2--DEC2006
358--RI--2006GWSamplingReport-1of3--FEB2009
358--RI--2006GWSamplingReport-2of3--FEB2009
358--RI--2006GWSamplingReport-3of3--FEB2009
359--RI--2007GWSamplingReport--FEB2009
3006--RI--Tech Memo for Offsite Brush Creek SW and GW Sampling--FEB2009
3007--RI--Tech Memo for Offsite Brush Creek SW and GW Results--JUN2009
3007.1--RI--Tech Memo for Offsite Brush Creek SW Update--JUN2014
502--RI—Executive Summary Uniform Federal Policy-Quality Assurance Project Plan Packet 1—DEC2017
Feasibility Study (FS)
401--FS--Groundwater Feasibility Study Report--DEC1997
403--FS--Interim Groundwater Feasibility Study Report-1of2--AUG1998
403--FS--Interim Groundwater Feasibility Study Report-2of2--AUG1998
3008--FS--Offsite Groundwater Treatability Study Test Plan--NOV2004
Proposed Plan (PP)
3009--PP--Offsite Groundwater Proposed Plan--JUL2004
3010--PP--Offsite Groundwater Proposed Plan Public Meeting Handouts--JUL2004
3011--PP--Offsite Groundwater Proposed Plan Transcript--JUL2004
Record of Decision (ROD)
3012--Offsite Groundwater Record of Decision--1of2--JUN2005
3012--Offsite Groundwater Record of Decision-2of2--JUN2005
Remedial Action/Remedial Design (RA/RD)
3016 Off-site Groundwater Remediation Progress Report Two Feb 2008 - Oct 2008 (Nov 2009)
Preliminary Assessments (PA)
100--PA--Installation Assessment--JAN1980
109--PA--News Release--AUG1991
110--PA--Conceptual Program Plan--SEP1991
111--PA--Technical Review Committee Minutes--MAY1993
112--PA--Preliminary Assessments for 43 IAAAP Sites--OCT1994
113--PA--Installation Environmental Assessment--OCT1995
Site Inspections (SI)
200--SI--Sampling and Analysis Plan Vol 2 Field Sampling Plan--JUN1991
201--SI--Sampling and Analysis Plan Vol 1 Quality Assurance Project Plan--JUL1991
202--SI--Site Inspection--JUN1992
207--SI--Site Characterization Report R12-R21--MAR1993
Remedial Investigations (RI)
301--RI--Risk Assessment Protocol--OCT1992
4000--RI--Inert Landfill Closure Plans 1of3--OCT1994
4000--RI--Inert Landfill Closure Plans 2of3--OCT1994
4000--RI--Inert Landfill Closure Plans 3of3--OCT1994
1--ALL--Federal Facilities Agreement--SEP1990
303--RI--Field Sampling Plan Addendum--MAR1995
304--RI--Engineering Evaluation Cost Analysis for Three Removal Actions 1of2--MAY1995
304--RI--Engineering Evaluation Cost Analysis for Three Removal Actions 2of2--MAY1995
4001--RI--Trench 6 and Trench 7 Asbuilts--AUG1996
305--RI--Implementation Proposal for Environmental Protection--FEB1996
306--RI--Risk Assessment--MAY1996
307--RI--Work Plan for Multiple Removal Actions--AUG1996
311--RI--Work QA Plan Eco Risk Assessment Addendum--JUL1997
312--RI--Multiple Removal Actions - Construction Progress Photo--SEP1997
315--RI--Historical Eco Risk Assessment Addendum--MAR1998
324--RI--Modification to the SAP Eco Assessment--APR2000
325--RI--Eco Risk Round 2 Sampling--SEP2000
327--RI--Eco Risk Assessment Screening Level--APR2001
330--RI--Bio-remediation Metals Treatment WBPLF Soil Work Plan--JUL2001
332--RI--Development of Dose Est Models and Toxicity Eco--AUG2001
333--RI--Screening Level Risk Assessment Eco-text-appendixA--AUG2001
333--RI--Screening Level Risk Assessment Eco-appendixB-J--AUG2001
337--RI--Bio-remediation Metals Treatment WBPLF Soils Supplemental Work Plan--AUG2001
338--RI--Addendum to Screening Level Risk Assessment Eco--DEC2001
342--RI--Technical Memos 1-4 for the Eco Risk Assessment--APR2002
343--RI--Work Plan Addendum Metals Treatment WBPLF Soils--AUG2002
349--RI--Technical Memorandum #5 for the BERA--JUL2004
350--RI--BERA Vol I and II 1of2--OCT2004
350--RI--BERA Vol I and II 2of2--OCT2004
357.1--RI--Brush Creek SW and Sediment Investigation Work Plan--FEB2006
357--RI--Comprehensive Watersheds Evaluation and Supplemental Data Collection Work Plan 1of3--DEC2006
357--RI--Comprehensive Watersheds Evaluation and Supplemental Data Collection Work Plan 2of3--DEC2006
357--RI--Comprehensive Watersheds Evaluation and Supplemental Data Collection Work Plan 3of3--DEC2006
4001--RI--Supplemental Remedial Investigation (JAN 2022)
4036--RI--Remedial Investigation for OU4 Inert Disposal Area (Feb2022)
502--RI--Executive Summary Uniform Federal Policy-Quality Assurance Project Plan Packet 1 (DEC 2017)
Feasibility Study (FS)
4002--FS--Proposal for CAMU Designation--NOV1995
4003--FS--Designation of CAMU--MAR1996
400--FS--Soils Focused Feasibility Study--MAY1997
402--FS--Soils Feasibility Report--JUN1998
4004--FS--IDA Focused Feasibility Study--JAN2007
Proposed Plan (PP)
500--PP-Focused Soils Proposed Plan (Applies to IROD)--MAY1997
4005--PP--IDA Proposed Plan--MAY2007
4006--PP--IDA Proposed Plan Press Release--JUN2007
Record of Decision (ROD)
4006.1--ROD--Action Memorandum for the Inert Landfill--SEP1997
4007--ROD--IDA Interim Action Record of Decision--SEP2008
Remedial Design/Remedial Action (RD/RA)
4009--RA--Status Report for Soil Chemical Treatment Inert Disposal Area (Mar 2009)
4010--RA--Technical Memorandum Soil Treatment Results for Alkaline Hydrolysis in Trench 6 Inert Disposal Area (Nov 2009)
4013--RA--Remedial Action Report for Biological Soil Treatment at the Inert Disposal Area (Jan 2010)
4016--RD--Inert Disposal Area Winterization Plan (Nov 2010)
4017--RA--After Action Report Inert Disposal Area Winterization (Nov 2010)
4019--RA--RACR Capping of the Cap Extension Area (CEA) (Jul 2011)
4021--RA--Rev. 1 Vol. 3 Soil Treatment Activities OU4 RACR (Apr 2013)
4022--RA--RACR Vol. 4 LUC, Long-Term Monitoring and O&M Plan for IDA (Jul 2014)
4023--RA--RACR Vol. 5 Removal of Sediment Ponds CEA, 6 & 7 (Feb 2013)
4024--RA--Rev. 1 OU4 Remedial Action Work Plan IDA Boundary Fence Installation (Jan 2016)
4025--Land Use Controls Implementation Plan for the IDA (Apr 2014)
4027--RD--Fixed Facility Water Treatment Plant Operations and Maintenance Plan (Oct 2016)
4028--After Action Report for Boundary Fence Installation at the IDA (Nov 2016)
4030--Operation & Maintenance Plan (Oct 2017)
5050--MMRP-Public-Notice--NOV2007
5060--MMRP-RIFS-Guidance--NOV2009
Preliminary Assessment (PA)
5000--PA-Closed, Transferring, and Transferred Range Site Inventory Report--OCT2003
Site Inspection (SI)
5001--SI--MMRP Historical Records Review 1of5--JUL2007
5001--SI--MMRP Historical Records Review 2of5--JUL2007
5001--SI--MMRP Historical Records Review 3of5--JUL2007
5001--SI--MMRP Historical Records Review 4of5--JUL2007
5001--SI--MMRP Historical Records Review 5of5--JUL2007
Remedial Investigation (RI)
348--RI--Work Plan for UXO Survey at Line 6 and Central Test Area 1-of-3--MAY2004
348--RI--Work Plan for UXO Survey at Line 6 and Central Test Area 2-of-3--MAY2004
348--RI--Work Plan for UXO Survey at Line 6 and Central Test Area 3-of-3--MAY2004
352--RI--Line 6 and Central Test Area Mec Density Survey Report 1of2--MAY2005
352--RI--Line 6 and Central Test Area Mec Density Survey Report 2of2--MAY2005
5003--RI--MMRP-RI Work Plan 1of2--APR2008
5003--RI--MMRP RI Work Plan 2of2--APR2008
5004--RI--MMRP GPO Plan--JUN2008
5005--RI--MMRP GPO Technical Memorandum 1of2--SEP2008
5005--RI--MMRP GPO Technical Memorandum 2of2--SEP2008
5006--RI--Geophysical Investigation Letter Work Plan Addendum--SEP2008
5007--RI--MMRP Public Notice--OCT2008
5008--RI--MMRP Intrusive Investigation Letter Work Plan Addendum--MAY2009
5009--RI--MMRP RI 1of5--JUN2011
5009--RI--MMRP RI 2of5--JUN2011
5009--RI--MMRP RI 3of5--JUN2011
5009--RI--MMRP RI 4of5--JUN2011
5009--RI--MMRP RI 5of5--JUN2011
5010--RI--MMRP Accident Prevention Plan--NOV2011
5011--RI--MMRP Fence Installation Work Plan--FEB2012
5013--RI--MMRP EE/CA Work Plan for the HSAR--MAY2012
5014--RI--MMRP EE/CA for the HSAR--APR2013
5014.1--RI--MMRP Action Memo for the HSAR--OCT2013
502--RI—Executive Summary Uniform Federal Policy-Quality Assurance Project Plan Packet 1—DEC2017
5034--RI—Site-specific Worksheets for Operable Unit 5 of the Uniform Federal Policy-Quality Assurance Project Plan Packet 2—APR2018
Feasibility Study (FS)
5012--FS--MMRP FS Amendment--NOV2012
Proposed Plan (PP)
5015--PP--Proposed Plan Public Meeting Notice--APR 2013
5016--PP--MMRP Proposed Plan Public Meeting Minutes for the HSAR EE/CA--MAY 2013
5017--PP--MMRP Proposed Plan--MAY 2013
5038--PP--MMRP Revised Proposed Plan--DEC 2022
5039--PP--MMRP Revised Proposed Plan Public Meeting Notice--JAN 2023
Record of Decision (ROD)
Remedial Design/Remedial Action (RD/RA)
5019 After Action Report Fencing Inspection -May 2015 PDS & InDA (July 2015)
5020 Final Removal Action Work Plan for HSAR (Sep 2015)
5021 After Action Report Fencing of PDS & InDA MRS's (Feb 2013)
5022 Final Fencing Maintenance Plan PDS & InDA MRSs (Aug 2015)
5023 Final Work Plan for Remedial Action at the PDS (Feb 2016)
5026 Final LUCIP for the CTA, InDA, L6 Ammo Prod., and PDS MRS (Jul 2017)
5027 Remedial Action Completion Report for the Possible Demolition SiteOU5 (June 2017)
2028 After Action Report HSAR (Aug 2017)
5031 Work Plan for Maintenance Path Construction at the PDS
5032 2017 Annual LUC Implementation Report
5033 Site-Specific Final Report LTM Path Construction for PDS
5035 2020 Annual LUC Implementation Report
Preliminary Assessment (PA)
101--PA--Pollution Investigation for Pinkwater Lagoon, Line 6 and Line 4A 1of2--SEP1981
101--PA--Pollution Investigation for the Pinkwater Lagoon, Line 6 and Line 4A 2of2--SEP1981
102--PA--Contamination Geo-technical Reports--SEP1982
102--PA--Appendices
103--PA--Underground Pollution Investigation--FEB1982
104--PA--Subsurface Investigation at Site Z-1 (Abandoned Pink Water Lagoon)--FEB1982
105--PA--Follow-on Study of Environmental Contamination--AUG1984
6000--PA--Groundwater QA Plan for the IDA and Line 6--JUN1985
107--PA--Midwest Site Confirmation Survey Sampling--AUG1986
6001--PA--Sampling and Analysis Plan-Quality Control-Quality Assurance Plan for the IDA and Line 6 Groundwater--MAR1988
6002--PA--Groundwater Quality Assessment for the IDA and Line 6 Areas 1of2--DEC1989
6002--PA--Groundwater Quality Assessment for the IDA and Line 6 Areas 2of2--DEC1989
108--PA--Potential Areas Concern Supplement--MAY1991
109--PA--News Release--AUG1991
110--PA--Conceptual Program Plan--SEP1991
6003--PA--Monitoring Evaluation for the IDA and Line 6--JAN1992
6004--PA--Work Plan and Groundwater Quality Assessment Plan for Trench 5 and Line 6-1of2--OCT1993
6004--PA--Work Plan and Groundwater Quality Assessment Plan for Trench 5 and Line 6-2of2--OCT1993
111--PA--Technical Review Committee Minutes--MAY1993
6005--PA--Groundwater Assessment for Trench 5 and Line 6--MAY1994
6006--PA--Accelerated Groundwater Quality Assessment for the Ash Disposal Cell in Trench 5 and Line 6-1of3--OCT1994
6006--PA--Accelerated Groundwater Quality Assessment for the Ash Disposal Cell in Trench 5 and Line 6-2of3--OCT1994
6006--PA--Accelerated Groundwater Quality Assessment for the Ash Disposal Cell in Trench 5 and Line 6-3of3--OCT1994
112--PA--Preliminary Assessments for 43 IAAAP Sites--OCT1994
Site Inspection (SI)
200--SI--Sampling and Analysis Plan Vol 2 Field Sampling Plan--JUN1991
201--SI--Sampling and Analysis Plan Vol 1 Quality Assurance Project Plan--JUL1991
202--SI--Site Inspection--JUN1992
203--SI--Preliminary Site Characterization Reports--MAR1993
204--SI--Site Characterization Report R01--MAR1993
205--SI--Site Characterization Report R02 R03--MAR1993
206--SI--Site Characterization Report R04-R11--MAR1993
207--SI--Site Characterization Report R12-R21--MAR1993
208--SI--Site Characterization Report R22-R30--MAR1993
6006.1--SI--Acute and Chronic Toxicity Tests-1of2--APR1993
6006.1--SI--Acute and Chronic Toxicity Tests-2of2--APR1993
6007--SI--Basewide Analytes and Drilling Procedures--MAY1993
Remedial Investigation (RI)
300--RI--Endangerment Assessment Former Line 1 Impoundment and Line 800 Pinkwater Lagoon-1of2--JUL1989
300--RI--Endangerment Assessment Former Line 1 Impoundment and Line 800 Pinkwater Lagoon-2of2--JUL1989
301--RI--Risk Assessment Protocol for the RI/FS--OCT1992
302--RI--BHHERA for the Former Line 1 Impoundment and Line 800 Pinkwater Lagoon-1--JUN1994
302--RI--BHHERA for the Former Line 1 Impoundment and Line 800 Pinkwater Lagoon-2--JUN1994
6008--RI--Project Summary Report Technical Data Report for GW Monitoring--1of4-1995
6008--RI--Project Summary Report Technical Data Report for GW Monitoring--2of4-1995
6008--RI--Project Summary Report Technical Data Report for GW Monitoring--3of4-1995
6008--RI--Project Summary Report Technical Data Report for GW Monitoring--4of4-1995
303--RI--Field Sampling Plan Addendum--MAR1995
6009--RI--Fall 1995 Monitoring of IRP Wells--MAR1996
306--RI--Risk Assessment--MAY1996
6010--RI--Spring 1996 Monitoring of IRP Wells--SEP1996
308--RI--Explosives Removal from Groundwater Inflow through Systems Planted with Aquatic and Wetland Plants--DEC1996
309--RI--Screening of Aquatic and Wetland Plant Species for Phytoremediation of Explosives--JAN1997
6011--RI--Site Groundwater Investigation Fire Training Pit Work Plan and Sampling and Analysis Plan 1of2--APR1997
6011--RI--Site Groundwater Investigation Fire Training Pit Work Plan and Sampling and Analysis Plan 2of2--APR1997
310--RI--Multiple Removal Actions Transmittal of Radioactive Isotope Analytical Report--MAY1997
6012--RI--1996-1997 Monitoring of IRP Wells--AUG1997
6013--RI-1997 Monitoring of IRP Wells--SEP1997
313--RI--Quality Control Summary Report - Supplemental Groundwater RI--JAN1998
314--RI Multiple Removal Actions - Water Treatment Plant for Perched Water at the IDA--FEB1998
316--RI--Work Plan and Sampling and Analysis Plan - Supplemental RI Line 800 Pinkwater Lagoon--AUG1998
317--RI-Quality Control Summary Report - Supplemental RI Line 800 Pinkwater Lagoon--FEB1999
318--RI-Analytical Data Report - Supplemental Groundwater RI Line 800 Pinkwater Lagoon 1of2--MAR1999
318--RI-Analytical Data Report - Supplemental Groundwater RI Line 800 Pinkwater Lagoon 2of2--MAR1999
319--RI--Recommendations for Additional RI Line 800 Pinkwater Lagoon--MAY1999
320--RI--Work Plan Addendum - Supplemental RI Line 800 Pinkwater Lagoon--SEP1999
321--RI--Long Term Monitoring Event Fall 1999-Spring 2000 Work Plan Addendum--NOV1999
323--RI--Long Term Monitoring Event Spring 2000 Work Plan Addendum--APRapr2000
6014--RI--Fall 1999 Long Term Monitoring Report--JUN2000
6015--RI-Quality Control Summary Report Fall 1999 Groundwater Monitoring Sampling Event 1of2--JUL2000
6015--RI-Quality Control Summary Report Fall 1999 Groundwater Monitoring Sampling Event 2of2--JUL2000
328--RI--Technical Memorandum Evaluation of Contaminant Sources to Surface Streams--JUL2001
6016--RI--Spring 2000 Groundwater Monitoring Report--OCT2000
6017--RI--Fall 2000 Groundwater Monitoring Results Summary--APR2001
6018--RI-Spring 2001 Groundwater Monitoring Work Plan Addendum--MAY2001
329--RI--Supplemental RI Report Line 800 Pinkwater Lagoon 1of3--JUL2001
329--RI--Supplemental RI Report Line 800 Pinkwater Lagoon 2of3--JUL2001
329--RI--Supplemental RI Report Line 800 Pinkwater Lagoon 3of3--JUL2001
331--RI--Quality Control Summary Report Groundwater Monitoring Program Spring 2000 Sampling Event 1of2--AUG2001
331--RI--Quality Control Summary Report Groundwater Monitoring Program Spring 2000 Sampling Event 2of2--AUG2001
334--RI--Supplemental Groundwater RI 1of5--AUG2001
334--RI--Supplemental Groundwater RI 2of5--AUG2001
334--RI--Supplemental Groundwater RI 3of5--AUG2001
334--RI--Supplemental Groundwater RI 4of5--AUG2001
334--RI--Supplemental Groundwater RI 5of5--AUG2001
335--RI--Groundwater Monitoring Program--AUG2001
336--RI--Fall 2000-Spring 2001 Groundwater Monitoring Results Summary--AUG2001
339--RI--AO Construction Projects Sampling Work Plan 1of2--JAN2002
339--RI--AO Construction Projects Sampling Work Plan 2of2--JAN2002
340--RI--Facility Wide Work Plan for Groundwater--FEB2002
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 1of6--FEB2002
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 2of6--FEB2002.
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 3of6--FEB2002
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 4of6--FEB2002
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 5of6--FEB2002
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 6of6--FEB2002
6019--RI--Spring 2002 Groundwater Monitoring Work Plan Addendum--MAY2002
6020--RI-Initial Groundwater Analytical Results and Monitoring Well Locations Six Sites FS Data Collection 1of2--FEB2003
6020--RI-Initial Groundwater Analytical Results and Monitoring Well Locations Six Sites FS Data Collection 2of2--FEB2003
347--RI--2002 Groundwater Monitoring Report 1of5--AUG2003
347--RI--2002 Groundwater Monitoring Report 2of5--AUG2003
347--RI--2002 Groundwater Monitoring Report 3of5--AUG2003
347--RI--2002 Groundwater Monitoring Report 4of5--AUG2003
347--RI--2002 Groundwater Monitoring Report 5of5--AUG2003
6021--RI--Initial Groundwater Analytical Results Six Sites FS Data Collection 1of2--SEP2003
6021--RI--Initial Groundwater Analytical Results Six Sites FS Data Collection 2of2--SEP2003
351--RI--2003 Groundwater Monitoring Report 1of5--DEC2004
351--RI--2003 Groundwater Monitoring Report 2of5--DEC2004
351--RI--2003 Groundwater Monitoring Report 3of5--DEC2004
351--RI--2003 Groundwater Monitoring Report 4of5--DEC2004
351--RI--2003 Groundwater Monitoring Report 5of5--DEC2004
354--RI--2004 Groundwater Monitoring Report 1of4--JUL2005
354--RI--2004 Groundwater Monitoring Report 2of4--JUL2005
354--RI--2004 Groundwater Monitoring Report 3of4--JUL2005
354--RI--2004 Groundwater Monitoring Report 4of4--JUL2005
355--RI--2004-2005 Groundwater Sampling Report 1of5--DEC2005
355--RI--2004-2005 Groundwater Sampling Report 2of5--DEC2005
355--RI--2004-2005 Groundwater Sampling Report 3of5--DEC2005
355--RI--2004-2005 Groundwater Sampling Report 4of5--DEC2005
355--RI--2004-2005 Groundwater Sampling Report 5of5--DEC2005
357.1--RI--Brush Creek SW and Sediment Investigation Work Plan--FEB2006
357--RI--Comprehensive Watersheds Evaluation Work Plan 1of3--DEC2006
357--RI--Comprehensive Watersheds Evaluation Work Plan 2of3--DEC2006
357--RI--Comprehensive Watersheds Evaluation Work Plan 3of3--DEC2006
6022--RI--Concentration Trends for Selected Wells and Parameters--AUG2007
358--RI--2006 Groundwater Sampling Report 1of3--FEB2009
358--RI--2006 Groundwater Sampling Report 2of3--FEB2009
358--RI--2006 Groundwater Sampling Report 3of3--FEB2009
359--RI--2007 Groundwater Sampling Report--FEB2009
6023--RI--On-site Groundwater Treatability Study Tech Memo--FEB2009
6023.1--RI--Work Plan for Supplemental RI of GW and SW at Line 1, and Field Modification 1of6--MAY2011
6023.1--RI--Work Plan for Supplemental RI of GW and SW at Line 1, and Field Modification 2of6--MAY2011
6023.1--RI--Work Plan for Supplemental RI of GW and SW at Line 1, and Field Modification 3of6--MAY2011
6023.1--RI--Work Plan for Supplemental RI of GW and SW at Line 1, and Field Modification 4of6--MAY2011
6023.1--RI--Work Plan for Supplemental RI of GW and SW at Line 1, and Field Modification 5of6--MAY2011
6023.1--RI--Work Plan for Supplemental RI of GW and SW at Line 1, and Field Modification 6of6--MAY2011
6023.3--RI-Tech Memo and Work Plan Addendum for Line 1 Groundwater and SW 1of2--OCT2012
6023.3--RI--Tech Memo and Work Plan Addendum for Line 1 Groundwater and SW 2of2--OCT2012
502--RI—Executive Summary Uniform Federal Policy-Quality Assurance Project Plan Packet 1—DEC2017
6036--RI—Site-specific Worksheets for Operable Unit 6 of the Uniform Federal Policy-Quality Assurance Project Plan Packet 1—DEC2017
6037--RI—Site-specific Worksheets for Operable Unit 6 of the Uniform Federal Policy-Quality Assurance Project Plan Packet 2—APR2018
6038--RI—Site-specific Worksheets for Operable Unit 6 of the Uniform Federal Policy-Quality Assurance Project Plan Packet 3—JUL2018
6039--RI—Site-specific Worksheets for Watersheds of the Uniform Federal Policy-Quality Assurance Project Plan Packet 3—JUL2018
6040--RI—Site-Specific Worksheets for Operable Unit 6 of the Uniform Federal Policy-Quality Assurance Project Plan Packet 4—JAN2019
6041--RI—Iron Bioreactor Treatability Study—APR2019
6042--RI—Iron Bioreactor Treatability Study and Experiment Basis of Design—AUG2019
6043--RI—Iron Bioreactor Treatability Test Design—FEB2020
6044--RI--Iron Bioreactor Treatability Test Completion Report--JUL2021
Feasibility Study (FS)
401--FS--Groundwater Feasibility Study Report--DEC1997
403--FS--Interim Groundwater Feasibility Study Report-1of2--AUG1998
403--FS--Interim Groundwater Feasibility Study Report-2of2--AUG1998
404--FS--Evaluation of Natural Attenuation--OCT1999
6024--FS--Fire Training Pit, West Burn Pads Area, and East Burn Pads Area FS Data Collection Work Plan Add--OCT2002
6025--FS--Lines 2, 3 and 9 FS Data Collection Work Plan--OCT2002
405--FS--Line 800 Pinkwater Lagoon FS--FEB2003
6026--FS--Line 3 Groundwater Remedial Alternatives Analysis 1of2--JAN2004
6026--FS--Line 3 Groundwater Remedial Alternatives Analysis 2of2--JAN2004
6027--FS--Line 9 Groundwater Remedial Alternatives Analysis 1of2--JAN2004
6027--FS--Line 9 Groundwater Remedial Alternatives Analysis 2of2--JAN2004
6028--FS--Line 2 Groundwater Remedial Alternatives Analysis 1of3--FEB2004
6028--FS--Line 2 Groundwater Remedial Alternatives Analysis 2of3--FEB2004
6028--FS--Line 2 Groundwater Remedial Alternatives Analysis 3of3--FEB2004
6029--FS--Fire Training Pit Groundwater Remedial Alternatives Analysis 1of2--MAY2004
6029--FS--Fire Training Pit Groundwater Remedial Alternatives Analysis 2of2--MAY2004
6030--FS--East Burning Pads Groundwater Remedial Alternatives Analysis 1of2--JUN2004
6030--FS--East Burning Pads Groundwater Remedial Alternatives Analysis 2of2--JUN2004
6031--FS--West Burn Pads Groundwater Investigation 1of2--JUN2004
6031--FS--West Burn Pads Groundwater Investigation 2of2--JUN2004
6032--FS--Treatability Study Test Plan for In-Situ Bio-gradation of On-Post Groundwater--APR2005
Preliminary Assessment (PA)
100--PA--Installation Assessment--JAN1980
101--PA--Pollution Investigation for Pinkwater Lagoon, Line 6 and Line 4A 1of2--SEP1981
101--PA--Pollution Investigation for the Pinkwater Lagoon, Line 6 and Line 4A 2of2--SEP1981
102--PA--Contamination Geo-technical Reports--SEP1982
102--PA--Appendices
103--PA--Underground Pollution Investigation--FEB1982
104--PA--Subsurface Investigation at Site Z-1 (Abandoned Pink Water Lagoon)--FEB1982
105--PA--Follow-on Study of Environmental Contamination--AUG1984
107--PA--Midwest Site Confirmation Survey Sampling--AUG1986
108--PA--Potential Areas Concern Supplement--MAY1991
109--PA--News Release--AUG1991
110--PA--Conceptual Program Plan--SEP1991
111--PA--Technical Review Committee Minutes--MAY1993
112--PA--Preliminary Assessments for 43 IAAAP Sites--OCT1994
113--PA--Installation Environmental Assessment--OCT1995
Site Inspections (SI)
200--SI--Sampling and Analysis Plan Vol 2 Field Sampling Plan--JUN1991
201--SI--Sampling and Analysis Plan Vol 1 Quality Assurance Project Plan--JUL1991
2002--SI--Site Inspection--JUN1992
203--SI--Preliminary Site Characterization Reports--MAR1993
204--SI--Site Characterization Report R01--MAR1993
205--SI--Site Characterization Report R02 R03--MAR1993
206--SI--Site Characterization Report R04-R11--MAR1993
207--SI--Site Characterization Report R12-R21--MAR1993
208--SI--Site Characterization Report R22-R30--MAR1993
209--SI--Site Assessment Project Plans--JUN2000
210--SI--Field Sampling Report--FEB2001
211--SI-Historical Record Review for Line 6, Line 800, Central Test Area and Deactivation Furnance-1of7--SEP2004
211--SI-Historical Record Review for Line 6, Line 800, Central Test Area and Deactivation Furnance-2of7--SEP2004
211--SI-Historical Record Review for Line 6, Line 800, Central Test Area and Deactivation Furnance-3of7--SEP2004
211--SI-Historical Record Review for Line 6, Line 800, Central Test Area and Deactivation Furnance-4of7--SEP2004
211--SI-Historical Record Review for Line 6, Line 800, Central Test Area and Deactivation Furnance-5of7--SEP2004
211--SI-Historical Record Review for Line 6, Line 800, Central Test Area and Deactivation Furnance-6of7--SEP2004
211--SI-Historical Record Review for Line 6, Line 800, Central Test Area and Deactivation Furnance-7of7--SEP2004
Remedial Investigations (RI)
301--RI--Risk Assessment Protocol for the RI/FS--OCT1992
302--RI--BHHERA for the Former Line 1 Impoundment and Line 800 Pinkwater Lagoon-1--JUN1994
302--RI--BHHERA for the Former Line 1 Impoundment and Line 800 Pinkwater Lagoon-2--JUN1994
303--RI--Field Sampling Plan Addendum--MAR1995
7007--RI--Field Investigation Report for Former Line 1 Impoundment and Line 800 Pink Water Lagoon Sampling--APR1995
7008--RI--Final Work Plan - Rapid Response Interim Removal Actions at the Pesticide Pit and Sumps--APR1995
7009--RI--Sampling and Analysis Plan for Rapid Response Interim Removal Actions at the Pesticide Pit and Explosive Contaminated Sumps--APR1995
304--RI--Engineering Evaluation/Cost Analysis for Three Removal Actions-1of2--MAY1995
304--RI--Engineering Evaluation/Cost Analysis for Three Removal Actions-2of2--MAY1995
305--RI--Implementation Proposal for Environmental Protection--FEB1996
7011--RI--Engineering Evaluation/Cost Analysis Study for the Fire Training Pit--MAY1996
306--RI--Risk Assessment--MAY1996
307--RI--Work Plan for Multiple Removal Actions at Line 1 Impoundment, Line 800 Lagoon and the Inert Disposal Area--AUG1996
7012--RI--Sampling and Analysis Plan for Treated Discharges of the Water Contained in the Line 800 Pink Water Lagoon--AUG1996
7013--RI--Wetland Borrow Assessment Report--AUG1996
7014--RI--Final Report Addendum for Transportation and Disposal and Other Activities at the Pesticide Pit and Explosive Contaminated Sumps--NOV1996
308--RI--Explosives Removal from Groundwater Inflow through Systems Planted with Aquatic and Wetland Plants--DEC1996
309--RI--Screening of Aquatic and Wetland Plant Species for Phytoremediation of Explosives--JAN1997
310--RI--Multiple Removal Actions Transmittal of Radioactive Isotope Analytical Report--MAY1997
311--RI--Work QA Plan Eco Risk Assessment Addendum--JUL1997
312--RI--Multiple Removal Actions - Construction Progress Photo--SEP1997
314--RI Multiple Removal Actions - Water Treatment Plant for Perched Water at the IDA--FEB1998
315--RI--Historical Eco Risk Assessment Addendum--MAR1998
7015--RI--Site Monitoring Reports for the Former Fuel Station--JUL1998
7016--RI--Final Work Plan, Final Sampling and Analysis Plan Addendum, Final Site Safety and Health Plan Addendum for the Fire Training Pit--JUL1998
316--RI--Work Plan and Sampling and Analysis Plan - Supplemental RI Line 800 Pinkwater Lagoon--AUG1998
317--RI-Quality Control Summary Report - Supplemental RI Line 800 Pinkwater Lagoon--FEB1999
7017--RI--Line 1 and 800 Phytoremediation Monitoring--FEB1999 and Phyoremediation Results--FALL1997
318--RI-Analytical Data Report - Supplemental Groundwater RI Line 800 Pinkwater Lagoon 1of2--MAR1999
318--RI-Analytical Data Report - Supplemental Groundwater RI Line 800 Pinkwater Lagoon 2of2--MAR1999
319--RI--Recommendations for Additional RI Line 800 Pinkwater Lagoon--MAY1999
320--RI--Work Plan Addendum - Supplemental RI Line 800 Pinkwater Lagoon--SEP1999
7018--RI--Site Monitoring Reports for the Former Fuel Station--JAN2000
324--RI--Modification to the SAP Eco Assessment--APR2000
7019--RI--Revised RBCA Tier 2 Report--MAY2000
325--RI--Eco Risk Round 2 Sampling--SEP2000
7020--RI--Site Monitoring Reports for the Former Fuel Station--NOV2000
7021--RI--Site monitoring Report for Former Fuel Station--DEC2000
327--RI--Eco Risk Assessment Screening Level--APR2001
329--RI--Supplemental RI Report Line 800 Pinkwater Lagoon 1of3--JUL2001
329--RI--Supplemental RI Report Line 800 Pinkwater Lagoon 2of3--JUL2001
329--RI--Supplemental RI Report Line 800 Pinkwater Lagoon 3of3--JUL2001
331--RI--Quality Control Summary Report Groundwater Monitoring Program Spring 2000 Sampling Event 1of2--AUG2001
331--RI--Quality Control Summary Report Groundwater Monitoring Program Spring 2000 Sampling Event 2of2--AUG2001
333--RI--Screening Level Risk Assessment Eco (Text - Appendix A)--AUG2001
333--RI--Screening Level Risk Assessment Eco (Appendix B-J)--AUG2001
338--RI--Addendum to Screening Level Risk Assessment Ecological--DEC2001
339--RI--AO Construction Projects Sampling Work Plan 1of2--JAN2002
339--RI--AO Construction Projects Sampling Work Plan 2of2--JAN2002
342--RI--Technical Memorandums Numbers 1-4 for the Ecological Risk Assessment--APR2002
344--RI--Aerial Radiation Survey Work Plan--OCT2002
345--RI--Line 800 Pinkwater Lagoon Groundwater Flow and Contaminant Flow and Trans Modeling Tech Memo--FEB2003
346--RI--Aerial Radiological Survey--JUL2003
7022--RI--Supplemental Work Plan for the Fire Training Pit Removal Action--AUG2003
7023--RI--Report for the Investigation of the Tar-Like Substance Piles--SEP2003
7024--RI--Sampling and Reconnaissance of Brush Creek--JAN2004
348--RI--Work Plan for UXO Survey at Line 6 and Central Test Area 1-of-3--MAY2004
348--RI--Work Plan for UXO Survey at Line 6 and Central Test Area 2-of-3--MAY2004
348--RI--Work Plan for UXO Survey at Line 6 and Central Test Area 3-of-3--MAY2004
349--RI--Technical Memo 5 BERA--JUL2004
349.1--RI--Soil Data Collection Work Plan 1of2--JUL2004
349.1--RI--Soil Data Collection Work Plan 2of2--JUL2004
350--RI--BERA Vol I and II 1of2--OCT2004
350--RI--BERA Vol I and II 2of2--OCT2004
352--RI--Line 6 and Central Test Area Mec Density Survey Report 1of2--MAY2005
352--RI--Line 6 and Central Test Area Mec Density Survey Report 2of2--MAY2005
353--RI--Soil Data Collection Report 1of6--MAY2005
353--RI--Soil Data Collection Report 2of6--MAY2005
353--RI--Soil Data Collection Report 3of6--MAY2005
353--RI--Soil Data Collection Report 4of6--MAY2005
353--RI--Soil Data Collection Report 5of6--MAY2005
353--RI--Soil Data Collection Report 6of6--MAY2005
356--RI--Supplemental RI Work Plan 1of4--MAY2006
356--RI--Supplemental RI Work Plan 2of4--MAY2006
356--RI--Supplemental RI Work Plan 3of4--MAY2006
356--RI--Supplemental RI Work Plan 4of4--MAY2006
357.1--RI--Brush Creek Surface Water and Sediment Investigation Work Plan--FEB2006
357--RI--Comprehensive Watersheds Evaluation Work Plan 1of2--DEC2006
357--RI--Comprehensive Watersheds Evaluation Work Plan 2of2--DEC2006
7025--RI--Progress Report for Brush Creek--JUL2008
7025--RI--Supplemental Remedial Investigation Rev 3 (Text)--AUG2011
502--RI—Executive Summary Uniform Federal Policy-Quality Assurance Project Plan Packet 1—DEC2017
7044--RI—Site-specific Worksheets for Operable Unit 7 of the Uniform Federal Policy-Quality Assurance Project Plan Packet 2—APR2018
Feasibility Study (FS)
7026--FS--Former Line 1 Impoundment and Line 800 Pink Water Lagoon Feasibility Study-1of4--JUN1994
7026--FS--Former Line 1 Impoundment and Line 800 Pink Water Lagoon Feasibility Study-2of4--JUN1994
7026--FS--Former Line 1 Impoundment and Line 800 Pink Water Lagoon Feasibility Study-3of4--JUN1994
7026--FS--Former Line 1 Impoundment and Line 800 Pink Water Lagoon Feasibility Study-4of4--JUN1994
7027--FS--Evaluation of Treatment Alternatives for Line 1 Impoundment and Line 800 Pink Water Lagoon--JUN1995
7028--FS--Bench Scale Composting Investigation for Line 1 Impoundment and Line 800 Pink Water Lagoon--NOV1997
404--FS--Evaluation of Natural Attenuation--OCT1999
7029--FS--Options for Corrective Action Design Report for Former Fuel Station--JUL2001
405--FS--Line 800 Pinkwater Lagoon FS--FEB2003
7030--FS--Brush Creek Point Source Control Work Plan-1of2--NOV2004
7030--FS--Brush Creek Point Source Control Work Plan-2of2--NOV2004
7031--FS--Brush Creek Point Source Control Treatment System Design (Text)--MAY2005
7032--FS--Technical Memorandum Cesium Source Evaluation--FEB2009
7033--FS--Brush Creek Point Source Control Treatment System Report--JUN2009
7033.1--FS--Work Plan for Feasibility Study Supplemental Data Collection--JUL2013
The Formerly Utilized Sites Remedial Action Program (FUSRAP) has the mission of protecting public health and the environment by removing low-level radioactive contamination generated by activities of the Manhattan Engineer District and the Atomic Energy Commission (MED/AEC) during the development of atomic weapons in the 1940s and 1950s. FUSRAP has a separate Federal Facility Agreement Under CERCLA Section 120, Administrative Docket Number: CERCLA-07-2005-0378.
http://www.mvs.usace.army.mil/Missions/Centers-of-Expertise/Formerly-Utilized-Sites-Remedial-Action-Program/Iowa-FUSRAP-Administrative-Record/
Remedial Investigation (RI)
9000--RI-Remedial Investigation Work Plan for Construction Debris Sites--MAY2013
9001--RI--Remedial Investigation for Construction Debris Sites VOLUME 1--MAR2014
9001--RI--Remedial Investigation for Construction Debris Sites VOLUME II (1of3)--MAR2014
9001--RI--Remedial Investigation for Construction Debris Sites VOLUME II (2of3)--MAR2014
9001--RI--Remedial Investigation for Construction Debris Sites VOLUME II (3of3)--MAR2014
502--RI—Executive Summary Uniform Federal Policy-Quality Assurance Project Plan Packet 1—DEC2017
9007--RI—Site-specific Worksheets for Operable Unit 9 of the Uniform Federal Policy-Quality Assurance Project Plan Packet 1—DEC2017
Feasibility Study (FS)
9002--FS--Focused Feasibility Study for Construction Debris Sites--AUG2014
Proposed Plan (PP)
9003--PP--Proposed Plan for Construction Debris Sites--JAN2015
9004--PP--Public Notice for Construction Debris Sites--JAN2015
9005--PP--Public Meeting Minutes for Construction Debris Sites--FEB2015
Record of Decision (ROD)
842 Site-Specific Worksheets for the Compliance Cleanup RCRA Sites, UFP-QAPP for RI at IAAAP (APRIL 2018)
12000--RI--Phase 1 Remedial Investigation Report for Operable Unit 12--AUG2021
TNT Cave Complex - Operable Unit Not Assigned
Preliminary Assessment (PA)
7038--PA--Work Plan for TNT Cave Complex Preliminary Assessment--MAR2016
7039--PA--TNT Cave Complex Preliminary Assessment--SEP2017
Site Inspections (SI)
7041--SI—Uniform Federal Policy - Quality Assurance Project Plan TNT Cave Complex Site Inspection--OCT 2018
7042--SI—Site Inspection Report for the TNT Cave Complex--JUN2019
#
Mathes Lake Investigation - Operable Unit Not Assigned
Preliminary Assessment (PA)
7036--PA--Work Plan for Mathes Lake Preliminary Assessment--APR2015
7037--PA--Preliminary Assessment for Mathes Lake 1of2--JAN2016
7037--PA--Preliminary Assessment for Mathes Lake 2of2--JAN2016
Site Inspections (SI)
7040--SI—Uniform Federal Policy – Quality Assurance Project Plan for a Site Inspection at Mathes Lake—AUG2018
7043--SI—Site Inspection Report for Mathes Lake—DEC2019
#
Preliminary Assessment (PA)
M12--PA—Revised Preliminary Assessment of Per- and Polyfluoroalkyl Substances (PFAS)--OCT2020
Site Inspections (SI)
Fourth Five-Year Review Report 2021
720--5YR--Final2021-5YR-MAR2021
Third Five-Year Review Report 2016
719--5YR--Final2015-5YR-1of4--MAR2016
719--5YR--Final2015-5YR-2of4--MAR2016
719--5YR--Final2015-5YR-3of4--MAR2016
719--5YR--Final2015-5YR-4of4--MAR2016
Second Five-Year Review Report 2011
711--5YR--Final20105YR-1of5--APR2011
711--5YR--Final20105YR-2of5--APR2011
711--5YR--Final20105YR-3of5--APR2011
711--5YR--Final20105YR-4of5--APR2011
711--5YR--Final20105YR-5of5--APR2011
First Five-Year Review Report 2006
707--5YR--Final2005-5YR-1of4--MAR2006
707--5YR--Final2005-5YR-2of4--MAR2006
707--5YR--Final2005-5YR-3of4--MAR2006
707--5YR--Final2005-5YR-4of4--MAR2006
8120--JAN 2023 | 8121--APR 2023 | 8122--JUL 2023 | 8123--OCT 2023
8116--JAN 2022 | 8117--APR 2022 | 8118--JUL 2022 | 8119--OCT 2022
8112--JAN 2021 | 8113--APR 2021 | 8114--JUL 2021 | 8115--OCT 2021
8108--JAN 2020 | 8109--APR 2020 | 8110--JUL 2020 | 8111--OCT 2020
8104--JAN 2019 | 8105--APR 2019 | 8106--JUL 2019 | 8107--OCT 2019
8100--JAN 2018 | 8101--APR 2018 | 8102--JUL 2018 | 8103--OCT 2018
8096--JAN 2017 | 8097--APR 2017 | 8098--JUL 2017 | 8099--OCT 2017
8092--JAN 2016 | 8093--APR 2016 | 8094--JUL 2016 | 8095--OCT 2016
8088--JAN 2015 | 8089--APR 2015 | 8090--JUL 2015 | 8091--OCT 2015
8084--JAN 2014 | 8085--APR 2014 | 8086--JUL 2014 | 8087--OCT 2014
8080--JAN 2013 | 8081--APR 2013 | 8082--JUL 2013 | 8083--OCT 2013
8076--JAN 2012 | 8077--APR 2012 | 8078--JUL 2012 | 8079--OCT 2012
8072--JAN 2011 | 8073--APR 2011 | 8074--JUL 2011 | 8075--OCT 2011
8068--JAN 2010 | 8069--APR 2010 | 8070--JUL 2010 | 8071--OCT 2010
8065--JAN 2009 | 8066--JUL 2009 | 8067--OCT 2009
8062--JAN 2008 | 8063--APR 2008 | 8064--AUG 2008
8058--JAN 2007 | 8059--APR 2007 | 8060--JUL 2007 | 8061--OCT 2007
8053--JAN 2006 | 8054--MAR 2006 | 8055--MAY 2006 | 8056--JUL 2006 | 8057--OCT 2006
8049--JAN 2005 | 8050--MAY 2005 | 8051--AUG 2005 | 8052--OCT 2005
8044--JAN 2004 | 8045--MAR 2004 | 8046--MAY 2004 | 8047--SEP 2004 | 8048--NOV 2004
8040--MAR 2003 | 8041--MAY 2003 | 8042--AUG 2003 | 8043--NOV 2003
8035--JAN 2002 | 8036--MAR 2002 | 8037--MAY 2002 | 8038--SEP 2002 | 8039--NOV 2002
8030--JAN 2001 | 8031--MAR 2001 | 8032--MAY 2001 | 8033--AUG 2001 | 8034--NOV 2001
8024--JAN 2000 | 8025--FEB 2000 | 8026--MAR 2000 | 8027--MAY 2000 | 8028--JUL 2000 | 8029--SEP 2000
8014--JAN 1999 | 8015--FEB 1999 | 8016--MAR 1999 | 8017--APR 1999 | 8018--MAY 1999 | 8019--JUN 1999 | 8020--JUL 1999 | 8021--SEP 1999 | 8022--OCT 1999 | 8023--DEC 1999
8005--JAN 1998 | 8006--FEB 1998 | 8007--MAR 1998 | 8008--APR 1998 | 8009--MAY 1998 | 8010--JUN 1998 | 8011--JUL 1998 | 8012--AUG 1998 | 8013--SEP 1998
8000--JUN 1997 | 8001--AUG 1997 | 8002--SEP 1997 | 8003--OCT 1997 | 8004--NOV 1997