IAAAP Administrative Record, required by the Code of Federal Regulations, is a compilation of documents that track the discovery, investigation and remedy selection for environmental clean-up activities. It also provides a mechanism for public participation. The documents contained in the Administrative Record were used as the basis for the selection of a response action. All hard copies of the Administrative Record reside at the installation. For a complete list of every document, download the Administrative Record Index – July 2024. You can also download a description of the CERCLA Phases.
1--ALL--Federal Facilities Agreement--SEP1990
2.0--ALL--Community Relations Plan--MAY1991
2.1--ALL--Community Relations Plan Update--FEB2001
2.2--ALL--Community Involvement Plan Addendum FUSRAP Areas--FEB2011
2.3--ALL--Community Relations Plan Update--SEP2011
2.4--ALL--Community Involvement Plan--MAY2017
3--ALL--ATSDR Public Health Assessment Note of Explanation--DEC1999
4--ALL--ATSDR Health Consultation Note of Explanation--MAR2001
5--ALL--ATSDR Health Consultation Environmental Pathway Evaluation--DEC2003
Preliminary Assessments (PA)
100--PA--Installation Assessment--JAN1980
102--PA--Contamination Geo-technical Reports--SEP1982
102--PA--Appendices
1000.01--PA--Petroleum Leak Spill Area Final Assessment--MAR1990
1000.1--PA--Replace Upgrade Explosives Collection Sumps Study--DEC1990
108--PA--Potential Areas Concern Supplement--MAY1991
109--PA--News Release--AUG1991
110--PA--Conceptual Program Plan--SEP1991
111--PA--Technical Review Committee Minutes--MAY1993
112--PA--Preliminary Assessments for 43 IAAAP Sites--OCT1994
113--PA--Installation Environmental Assessment--OCT1995
Site Inspections (SI)
200--SI--Sampling and Analysis Plan Vol 2 Field Sampling Plan--JUN1991
201--SI--Sampling and Analysis Plan Vol 1 Quality Assurance Project Plan--JUL1991
202--SI--Site Inspection--1 of 2--JUN1992
202--SI--Site Inspection--2 of 2--JUN1992
203--SI--Preliminary Site Characterization Reports--MAR1993
204--SI--Site Characterization Report R01--MAR1993
205--SI--Site Characterization Report R02 R03--MAR1993
206--SI--Site Characterization Report R04-R11--MAR1993
207--SI--Site Characterization Report R12-R21--MAR1993
208--SI--Site Characterization Report R22-R30--MAR1993
209--SI--Site Assessment Project Plans--JUN2000
210--SI--Field Sampling Report--FEB2001
Remedial Investigations (RI)
300--RI--Endangerment Assessment Line 1 Impoundment Line 800 Lagoon 1 of 2--JUL1989
300--RI--Endangerment Assessment Line 1 Impoundment Line 800 Lagoon 2 of 2--JUL1989
301--RI--Risk Assessment Protocol--OCT1992
1000.2--RI--Contamination Assessment of Concrete Sumps--JUN1993
1000.3--RI--Engineering Evaluation Cost Analysis-Pesticide Pit Removal--OCT1994
1000.4--RI--Engineering Evaluation Cost Analysis-Explosive Contaminated Sumps--OCT1994
303--RI--Field Sampling Plan Addendum--MAR1995
306--RI--Risk Assessment-1of21-MAY1996
306--RI--Risk Assessment-2of21-MAY1996
306--RI--Risk Assessment-3of21-MAY1996
306--RI--Risk Assessment-4of21-MAY1996
306--RI--Risk Assessment-5of21-MAY1996
306--RI--Risk Assessment-6of21-MAY1996
306--RI--Risk Assessment-7of21-MAY1996
306--RI--Risk Assessment-8of21-MAY1996
306--RI--Risk Assessment-9of21-MAY1996
306--RI--Risk Assessment-10of21-MAY1996
306--RI--Risk Assessment-11of21-MAY1996
306--RI--Risk Assessment-12of21-MAY1996
306--RI--Risk Assessment-13of21-MAY1996
306--RI--Risk Assessment-14of21-MAY1996
306--RI--Risk Assessment-15of21-MAY1996
306--RI--Risk Assessment-16of21-MAY1996
306--RI--Risk Assessment-17of21-MAY1996
306--RI--Risk Assessment-18of21-MAY1996
306--RI--Risk Assessment-19of21-MAY1996
306--RI--Risk Assessment-20of21-MAY1996
306--RI--Risk Assessment-21of21-MAY1996
311--RI--Work QA Plan Eco Risk Assessment Addendum--JUL1997
315--RI--Historical Eco Risk Assessment Addendum--MAR1998
324--RI--Modification to the SAP Eco Assessment--APR2000
325--RI--Eco Risk Round 2 Sampling--SEP2000
327--RI--Eco Risk Assessment Screening Level--APR2001
330--RI--Bio-remediation Metals Treatment WBPLF Soil Work Plan--JUL2001
332--RI--Development of Dose Est Models and Toxicity Eco--AUG2001
333--RI--Screening Level Risk Assessment Eco-text-appendixA--AUG2001
333--RI--Screening Level Risk Assessment Eco-appendixB-J--AUG2001
337--RI--Bio-remediation Metals Treatment WBPLF Soils Supplemental Work Plan--AUG2001
1000--RI--Work Plan for Supplemental RI for Line 1 and Firing Sites 1-of-11--SEP2001
1000--RI--Work Plan for Supplemental RI for Line 1 and Firing Sites-2-of-11--SEP2001
1000--RI--Work Plan for Supplemental RI for Line 1 and Firing Sites-3-of-11--SEP2001
1000--RI--Work Plan for Supplemental RI for Line 1 and Firing Sites-4-of-11--SEP2001
1000--RI--Work Plan for Supplemental RI for Line 1 and Firing Sites-5-of-11--SEP2001
1000--RI--Work Plan for Supplemental RI for Line 1 and Firing Sites-6-of-11--SEP2001
1000--RI--Work Plan for Supplemental RI for Line 1 and Firing Sites-7-of-11--SEP2001
1000--RI--Work Plan for Supplemental RI for Line 1 and Firing Sites-8-of-11--SEP2001
1000--RI--Work Plan for Supplemental RI for Line 1 and Firing Sites-9-of-11--SEP2001
1000--RI--Work Plan for Supplemental RI for Line 1 and Firing Sites 10-of-11--SEP2001
1000--RI--Work Plan for Supplemental RI for Line 1 and Firing Sites 11-of-11--SEP2001
338--RI--Addendum to Screening Level Risk Assessment Eco--DEC2001
339--RI--AO Construction Projects Sampling Work Plan 1of2--JAN2002
339--RI--AO Construction Projects Sampling Work Plan 2of2--JAN2002
342--RI--Technical Memos 1-4 for the Eco Risk Assessment--APR2002
343--RI--Work Plan Addendum Metals Treatment WBPLF Soils--AUG2002
1001--RI--Supplemental RI for Line 1 and Firing Site (text)--AUG2002
1001--RI--Supplemental RI for Line 1 and Firing Site (figures)--AUG2002
1001--RI--Supplemental RI for Line 1 and Firing Site (tables)--AUG2002
1001--RI--Supplemental RI for Line 1 and Firing Site (appendix A-B)--AUG2002
1001--RI--Supplemental RI for Line 1 and Firing Site (appendix C)--AUG2002
1001--RI--Supplemental RI for Line 1 and Firing Site (appendix D)--AUG2002
1001--RI--Supplemental RI for Line 1 and Firing Site (appendix E-F)--AUG2002
1001--RI--Supplemental RI for Line 1 and Firing Site (appendix G1)--AUG2002
1001--RI--Supplemental RI for Line 1 and Firing Site (appendix G2)--AUG2002
1001--RI--Supplemental RI for Line 1 and Firing Site (RTC)--AUG2002
344--RI--Aerial Radiation Survey Work Plan--OCT2002
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-1-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-2-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-3-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-4-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-5-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-6-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-7-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-8-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-9-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-10-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-11-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-12-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-13-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-14-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-15-of-15--MAR2003
346--RI--Aerial Radio-logical Survey--JUL2003
348--RI--Work Plan for UXO Survey LL6 and CTA 1 of 3--MAY2004
348--RI--Work Plan for UXO Survey LL6 and CTA 2 of 3--MAY2004
348--RI--Work Plan for UXO Survey LL6 and CTA 3 of 3--MAY2004
349--RI--Technical Memo 5 BERA--JUL2004
349.1--RI--Soil Data Collection Work Plan 1of2--JUL2004
349.1--RI--Soil Data Collection Work Plan 2of2--JUL2004
1002.1--RI--HRR for L6-800-CTA-Deact Furnace 1of6--SEP2004
1002.1--RI--HRR for L6-800-CTA-Deact Furnace 2of6--SEP2004
1002.1--RI--HRR for L6-800-CTA-Deact Furnace 3of6--SEP2004
1002.1--RI--HRR for L6-800-CTA-Deact Furnace 4of6--SEP2004
1002.1--RI--HRR for L6-800-CTA-Deact Furnace 5of6--SEP2004
1002.1--RI--HRR for L6-800-CTA-Deact Furnace 6of6--SEP2004
350--RI--BERA-Vol-I-and-II-1of2--OCT2004
350--RI--BERA-Vol-I-and-II-2of2--OCT2004
352--RI--L6-CTA Mec Density Survey Report 1of2--MAY2005
352--RI--L6-CTA Mec Density Survey Report 2of2--MAY2005
353--RI--Soil Data Collection Report 1of6--MAY2005
353--RI--Soil Data Collection Report 2of6--MAY2005
353--RI--Soil Data Collection Report 3of6--MAY2005
353--RI--Soil Data Collection Report 4of6--MAY2005
353--RI--Soil Data Collection Report 5of6--MAY2005
353--RI--Soil Data Collection Report 6of6--MAY2005
1003--RI--Line 7 Post Demo Soil Sampling Work Plan--JAN2006
356--RI--Supplemental RI Work Plan 1of4--MAY2006
356--RI--Supplemental RI Work Plan 2of4--MAY2006
356--RI--Supplemental RI Work Plan 3of4--MAY2006
356--RI--Supplemental RI Work Plan 4of4--MAY2006
357.1--RI--Brush Creek SW and Sediment Investigation Work Plan--FEB2006
357--RI--Comprehensive Watersheds Evaluation Work Plan 1of3--DEC2006
357--RI--Comprehensive Watersheds Evaluation Work Plan 2of3--DEC2006
357--RI--Comprehensive Watersheds Evaluation Work Plan 3of3--DEC2006
502--RI—Executive Summary Uniform Federal Policy-Quality Assurance Project Plan Packet 1—DEC2017
Feasibility Study (FS)
1015--FS--Revised Work Plan for Soils FS--MAY1998
1023--FS--Remedial Action Report Focused FS Sites Phase 1--OCT2000
1032--FS--Final Remedial Action Report Focused FS Sites Phase 2--APR2001
400--FS--Soil Focused Feasibility Study--MAY1997
402--FS--Soils Feasibility Study Report--JUN1998
Proposed Plan (PP)
500--PP--Focused Soils Proposed Plan - Applies to IROD--MAY1997
1005--PP--Soils Proposed Plan - Applies to ROD--JUN1998
1005.1--PP--Soils Public Meeting Notice - Applies to ROD--JUN1998
1006--PP--Public Meeting Transcript--JUL1998
Decision Documents (DD)
1006.1--DD--Action Memorandum for the Pesticide Pit--MAR1995
1006.2--DD--Action Memo for Explosive Contaminated Sump Removal--NOV1995
1006.3--DD--Action Memo for Line 800 Pink Water Lagoon and Line 1 Impoundment--OCT1996
1006.4--DD--Explanation of Significant Difference and Action Memorandum for the Fire Training Pit--DEC1997
1007--DD--OU1 Interim Action Record of Decision--MAR1998
1008--DD--OU1 Record of Decision--AUG1998
1009--DD--Explanation of Significant Difference for the OU1 Record of Decision--JAN2003
1010--DD--Explanation of Significant Difference for OU1 IROD--JUN2006
1010.1--DD--ESD for OU1 IROD--JUN2008
1011--DD--Public Notice-Alkaline Hydrolysis ESD--AUG2009
1012--DD--ESD for OU1 ROD--SEP2009
1013--DD--ESD for OU1 ROD--MAR2011
1014--DD--Public Notice-ESD-Barium--MAR2011
1045--DD--OU1 ESD--OCT2018
1046--DD--Public Notice--OU-1 ESD--NOV2018
Remedial Design/Remedial Action (RD/RA)
1047--RA--OU-1 Land Use Controls Implementation Plan--NOV2019
1048--RA--2020 OU-1 Land Use Control Implementation Report--MAR2021
1049--RD--OU-1 UFP-QAPP Contaminated Soil Remedial Design--MAR2022 (1 of 2)
1049--RD--OU-1 UFP-QAPP Contaminated Soil Remedial Design--MAR2022 (2 of 2)
1050--RA--2021 OU-1 Land Use Controls Implementation Report--APR2022
1051--RA--2022 OU-1 Land Use Controls Implementation Report--JUN2023
1052--DD--OU-1 Re-evaluation of Soil Remedial Goals--JUL2023
1053--RD--OU-1-Contaminated-Soil-Remedial-Design--APR2024
1054--RA--2023 OU-1 Land Use Controls Implementation Report--APR2024
1055--RD--OU-1 UFP-QAPP Line 800--AUG2024
1--ALL--Federal Facilities Agreement--SEP1990
2.0--ALL--Community Relations Plan--MAY1991
2.1--ALL--Community Relations Plan Update--FEB2001
2.2--ALL--Community Involvement Plan Addendum FUSRAP Areas--FEB2011
2.3--ALL--Community Relations Plan Update--SEP2011
2.4--ALL--Community Involvement Plan--MAY2017
3--ALL--ATSDR Public Health Assessment Note of Explanation--DEC1999
4--ALL--ATSDR Health Consultation Note of Explanation--MAR2001
5--ALL--ATSDR Health Consultation Environmental Pathway Evaluation--DEC2003
Preliminary Assessments (PA)
102--PA--Contamination Geo-technical Reports--SEP1982
102--PA--Contamination Geo-technical Reports (drawings)--SEP1982
111--PA--Technical Review Committee Minutes--MAY1993
Remedial Investigation (RI)
301--RI--Risk Assessment Protocol--OCT1992
3000--RI--Action Memo for Offpost Rathbun Hookup--JUL1993
3001--RI--Public Meeting Transcript for Offpost Rathbun Connection--AU1993
302--RI--BHHERA for Former Line 1 Impoundment and Line 800 Lagoon 1of2--JUN1994
302--RI--BHHERA for Former Line 1 Impoundment and Line 800 Lagoon 2of2--JUN1994
306--RI--Risk Assessment--MAY1996
313--RI--Quality Control Summary Report Supplemental Groundwater RI--JAN1998
321--RI--LTM Events Fall 99-Spring 00 Work Plan Addendum--NOV1999
3002--RI-- Tech Memo Supplemental Investigation for Offsite Groundwater, Surfacewater and Sediment--JAN2000
323--RI--LTM Event Spring 2000 Work Plan Addendum--APR2000
328--RI--Tech Memos Fate and Transport of Contaminants and Evaluation--JUL2001
3003--RI--2001 Action Memo Addendum for Permanent Water--JUL2001
3004--RI--Offsite Groundwater RI Work Plan Addendum--AUG2001
334--RI--Supplemental Groundwater RI Report 1of5--AUG2001
334--RI--Supplemental Groundwater RI Report 2of5--AUG2001
334--RI--Supplemental Groundwater RI Report 3of5--AUG2001
334--RI--Supplemental Groundwater RI Report 4of5--AUG2001
334--RI--Supplemental Groundwater RI Report 5of5--AUG2001
335--RI--Groundwater Monitoring Program--AUG2001
336--RI--Fall 2000 Spring 2001 Groundwater Monitoring Results Summary--AUG2001
340--RI--Facility Wide Work Plan for Groundwater--FEB2002
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 1of6--FEB2002
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 2of6--FEB2002.
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 3of6--FEB2002
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 4of6--FEB2002
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 5of6--FEB2002
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 6of6--FEB2002
3005--RI--Offsite Monitoring Well and Staff Gauge Photo Log--DEC2002
347--RI--2002 Groundwater Monitoring Report 1of5--AUG2003
347--RI--2002 Groundwater Monitoring Report 2of5--AUG2003
347--RI--2002 Groundwater Monitoring Report 3of5--AUG2003
347--RI--2002 Groundwater Monitoring Report 4of5--AUG2003
347--RI--2002 Groundwater Monitoring Report 5of5--AUG2003
351--RI--2003 Groundwater Monitoring Report 1of5--DEC2004
351--RI--2003 Groundwater Monitoring Report 2of5--DEC2004
351--RI--2003 Groundwater Monitoring Report 3of5--DEC2004
351--RI--2003 Groundwater Monitoring Report 4of5--DEC2004
351--RI--2003 Groundwater Monitoring Report 5of5--DEC2004
354--RI--2004 Groundwater Monitoring Report 1of4--JUL2005
354--RI--2004 Groundwater Monitoring Report 2of4--JUL2005
354--RI--2004 Groundwater Monitoring Report 3of4--JUL2005
354--RI--2004 Groundwater Monitoring Report 4of4--JUL2005
355--RI--2004-2005 Groundwater Sampling Report 1of5--DEC2005
355--RI--2004-2005 Groundwater Sampling Report 2of5--DEC2005
355--RI--2004-2005 Groundwater Sampling Report 3of5--DEC2005
355--RI--2004-2005 Groundwater Sampling Report 4of5--DEC2005
355--RI--2004-2005 Groundwater Sampling Report 5of5--DEC2005
357.1--RI--Brush Creek Surface Water and Sediment Investigation Work Plan--FEB2006
357--RI--Comprehensive Watersheds Evaluation Work Plan 1of2--DEC2006
357--RI--Comprehensive Watersheds Evaluation Work Plan 2of2--DEC2006
358--RI--2006GWSamplingReport-1of3--FEB2009
358--RI--2006GWSamplingReport-2of3--FEB2009
358--RI--2006GWSamplingReport-3of3--FEB2009
359--RI--2007GWSamplingReport--FEB2009
3006--RI--Tech Memo for Offsite Brush Creek SW and GW Sampling--FEB2009
3007--RI--Tech Memo for Offsite Brush Creek SW and GW Results--JUN2009
3007.1--RI--Tech Memo for Offsite Brush Creek SW Update--JUN2014
502--RI--Executive Summary Uniform Federal Policy-Quality Assurance Project Plan Packet 1--DEC2017
Feasibility Study (FS)
401--FS--Groundwater Feasibility Study Report--DEC1997
403--FS--Interim Groundwater Feasibility Study Report-1of2--AUG1998
403--FS--Interim Groundwater Feasibility Study Report-2of2--AUG1998
3008--FS--Offsite Groundwater Treatability Study Test Plan--NOV2004
Proposed Plan (PP)
3009--PP--Offsite Groundwater Proposed Plan--JUL2004
3010--PP--Offsite Groundwater Proposed Plan Public Meeting Handouts--JUL2004
3011--PP--Offsite Groundwater Proposed Plan Transcript--JUL2004
Decision Documents (DD)
3012--DD--Offsite Groundwater Record of Decision--1of2--JUN2005
3012--DD--Offsite Groundwater Record of Decision-2of2--JUN2005
Remedial Design (RD)/Remedial Action (RA)
3014--RD--Remedial Action Work Plan Offsite Ground Water--APR2009
3016--RA--Offsite Groundwater Remediation Progress Report Two Feb 2008 - Oct 2008 (Nov 2009)
3018--RA--Offsite Groundwater Annual Report And Sampling & Analysis Plan--OCT2011
3020--RA--Offsite Groundwater Annual Report And Sampling & Analysis Plan--SEP2013
3037--RA--Offsite Annual Monitoring Report and Sampling & Analysis Plan FY2023-Partial--NOV2023
1--ALL--Federal Facilities Agreement--SEP1990
2.0--ALL--Community Relations Plan--MAY1991
2.1--ALL--Community Relations Plan Update--FEB2001
2.2--ALL--Community Involvement Plan Addendum FUSRAP Areas--FEB2011
2.3--ALL--Community Relations Plan Update--SEP2011
2.4--ALL--Community Involvement Plan--MAY2017
3--ALL--ATSDR Public Health Assessment Note of Explanation--DEC1999
4--ALL--ATSDR Health Consultation Note of Explanation--MAR2001
5--ALL--ATSDR Health Consultation Environmental Pathway Evaluation--DEC2003
Preliminary Assessments (PA)
100--PA--Installation Assessment--JAN1980
109--PA--News Release--AUG1991
110--PA--Conceptual Program Plan--SEP1991
111--PA--Technical Review Committee Minutes--MAY1993
112--PA--Preliminary Assessments for 43 IAAAP Sites--OCT1994
113--PA--Installation Environmental Assessment--OCT1995
Site Inspections (SI)
200--SI--Sampling and Analysis Plan Vol 2 Field Sampling Plan--JUN1991
201--SI--Sampling and Analysis Plan Vol 1 Quality Assurance Project Plan--JUL1991
202--SI--Site Inspection--JUN1992
207--SI--Site Characterization Report R12-R21--MAR1993
Remedial Investigations (RI)
301--RI--Risk Assessment Protocol--OCT1992
4000--RI--Inert Landfill Closure Plans 1of3--OCT1994
4000--RI--Inert Landfill Closure Plans 2of3--OCT1994
4000--RI--Inert Landfill Closure Plans 3of3--OCT1994
1--ALL--Federal Facilities Agreement--SEP1990
303--RI--Field Sampling Plan Addendum--MAR1995
304--RI--Engineering Evaluation Cost Analysis for Three Removal Actions 1of2--MAY1995
304--RI--Engineering Evaluation Cost Analysis for Three Removal Actions 2of2--MAY1995
4001--RI--Trench 6 and Trench 7 Asbuilts--AUG1996
305--RI--Implementation Proposal for Environmental Protection--FEB1996
306--RI--Risk Assessment--MAY1996
307--RI--Work Plan for Multiple Removal Actions--AUG1996
311--RI--Work QA Plan Eco Risk Assessment Addendum--JUL1997
312--RI--Multiple Removal Actions - Construction Progress Photo--SEP1997
315--RI--Historical Eco Risk Assessment Addendum--MAR1998
324--RI--Modification to the SAP Eco Assessment--APR2000
325--RI--Eco Risk Round 2 Sampling--SEP2000
327--RI--Eco Risk Assessment Screening Level--APR2001
330--RI--Bio-remediation Metals Treatment WBPLF Soil Work Plan--JUL2001
332--RI--Development of Dose Est Models and Toxicity Eco--AUG2001
333--RI--Screening Level Risk Assessment Eco-text-appendixA--AUG2001
333--RI--Screening Level Risk Assessment Eco-appendixB-J--AUG2001
337--RI--Bio-remediation Metals Treatment WBPLF Soils Supplemental Work Plan--AUG2001
338--RI--Addendum to Screening Level Risk Assessment Eco--DEC2001
342--RI--Technical Memos 1-4 for the Eco Risk Assessment--APR2002
343--RI--Work Plan Addendum Metals Treatment WBPLF Soils--AUG2002
349--RI--Technical Memorandum #5 for the BERA--JUL2004
350--RI--BERA Vol I and II 1of2--OCT2004
350--RI--BERA Vol I and II 2of2--OCT2004
357.1--RI--Brush Creek SW and Sediment Investigation Work Plan--FEB2006
357--RI--Comprehensive Watersheds Evaluation and Supplemental Data Collection Work Plan 1of3--DEC2006
357--RI--Comprehensive Watersheds Evaluation and Supplemental Data Collection Work Plan 2of3--DEC2006
357--RI--Comprehensive Watersheds Evaluation and Supplemental Data Collection Work Plan 3of3--DEC2006
4001--RI--Supplemental Remedial Investigation (JAN 2022)
4036--RI--Remedial Investigation for OU4 Inert Disposal Area (Feb2022)
502--RI--Executive Summary Uniform Federal Policy-Quality Assurance Project Plan Packet 1 (DEC 2017)
M13--RI--OU-4 UFP-QAPP for RI (Packet 4)
Feasibility Study (FS)
4002--FS--Proposal for CAMU Designation--NOV1995
4003--FS--Designation of CAMU--MAR1996
400--FS--Soils Focused Feasibility Study--MAY1997
402--FS--Soils Feasibility Report--JUN1998
4004--FS--IDA Focused Feasibility Study--JAN2007
4038--FS--Feasibility Study for OU-4--SEP2023
Proposed Plan (PP)
500--PP-Focused Soils Proposed Plan (Applies to IROD)--MAY1997
4005--PP--IDA Proposed Plan--MAY2007
4006--PP--IDA Proposed Plan Press Release--JUN2007
4040--PP--IDA Proposed Plan--JUL2024
Decision Documents (DD)
4006.1--DD--Action Memorandum for the Inert Landfill--SEP1997
4007--DD--IDA Interim Action Record of Decision--SEP2008
Remedial Design/Remedial Action (RD/RA)
4009--RA--Status Report for Soil Chemical Treatment Inert Disposal Area--MAR2009
4010--RA--Technical Memorandum Soil Treatment Results for Alkaline Hydrolysis in Trench 6 Inert Disposal Area--NOV2009
4013--RA--Remedial Action Report for Biological Soil Treatment at the Inert Disposal Area--JAN2010
4016--RD--Inert Disposal Area Winterization Plan--NOV2010
4017--RA--After Action Report Inert Disposal Area Winterization--NOV2010
4019--RA--RACR Capping of the Cap Extension Area (CEA)--JUL2011
4021--RA--Rev. 1 Vol. 3 Soil Treatment Activities OU4 RACR--APR2013
4022--RA--RACR Vol. 4 LUC, Long-Term Monitoring and O&M Plan for IDA--JUL2014
4023--RA--RACR Vol. 5 Removal of Sediment Ponds CEA, 6 & 7--FEB2013
4024--RA--Rev. 1 OU4 Remedial Action Work Plan IDA Boundary Fence Installation--JAN2016
4025--RA--Land Use Controls Implementation Plan for the IDA--APR2014
4027--RD--Fixed Facility Water Treatment Plant Operations & Maintenance Plan--OCT2016
4028--After Action Report for Boundary Fence Installation at the IDA--NOV2016
4030--RA--2017 Annual OU-4 Operation & Maintenance/LUC Report--OCT2017
4037--RA--FY21 Annual OU-4 Operation & Maintenance/LUC Report--AUG2022
4039--RA--FY22 Annual OU-4 Operations & Maintenance/LUC Report--AUG2023
4041--RA--FY23 Annual OU-4 Operations & Maintenance/LUC Report--OCT2024
1--ALL--Federal Facilities Agreement--SEP 1990
2.0--ALL--Community Relations Plan--MAY 1991
2.1--ALL--Community Relations Plan Update--FEB 2001
2.2--ALL--Community Involvement Plan Addendum FUSRAP Areas--FEB 2011
2.3--ALL--Community Relations Plan Update--SEP 2011
2.4--ALL--Community Involvement Plan--MAY 2017
2.5--Community Relations Plan for CTA, LL6 & PDS-N--AUG 2022
2.6--Community Relations Plan for PDS & InDA--MAY 2023
3--ALL--ATSDR Public Health Assessment Note of Explanation--DEC 1999
4--ALL--ATSDR Health Consultation Note of Explanation--MAR 2001
5--ALL--ATSDR Health Consultation Environmental Pathway Evaluation--DEC 2003
Preliminary Assessment (PA)
5000--PA-Closed, Transferring, and Transferred Range Site Inventory Report--OCT 2003
Site Inspection (SI)
5001--SI--MMRP Historical Records Review 1of5--JUL 2007
5001--SI--MMRP Historical Records Review 2of5--JUL 2007
5001--SI--MMRP Historical Records Review 3of5--JUL 2007
5001--SI--MMRP Historical Records Review 4of5--JUL 2007
5001--SI--MMRP Historical Records Review 5of5--JUL 2007
Remedial Investigation (RI)
5050--MMRP-Public-Notice--NOV2007
5060--MMRP-RI/FS-Guidance--NOV2009
348--RI--Work Plan for UXO Survey at Line 6 and Central Test Area 1-of-3--MAY 2004
348--RI--Work Plan for UXO Survey at Line 6 and Central Test Area 2-of-3--MAY 2004
348--RI--Work Plan for UXO Survey at Line 6 and Central Test Area 3-of-3--MAY 2004
352--RI--Line 6 and Central Test Area Mec Density Survey Report 1of2--MAY 2005
352--RI--Line 6 and Central Test Area Mec Density Survey Report 2of2--MAY 2005
5003--RI--MMRP-RI Work Plan 1of2--APR 2008
5003--RI--MMRP RI Work Plan 2of2--APR 2008
5004--RI--MMRP GPO Plan--JUN 2008
5005--RI--MMRP GPO Technical Memorandum 1of2--SEP 2008
5005--RI--MMRP GPO Technical Memorandum 2of2--SEP 2008
5006--RI--Geophysical Investigation Letter Work Plan Addendum--SEP 2008
5007--RI--MMRP Public Notice--OCT 2008
5008--RI--MMRP Intrusive Investigation Letter Work Plan Addendum--MAY 2009
5009--RI--MMRP RI 1of5--JUN 2011
5009--RI--MMRP RI 2of5--JUN 2011
5009--RI--MMRP RI 3of5--JUN 2011
5009--RI--MMRP RI 4of5--JUN 2011
5009--RI--MMRP RI 5of5--JUN 2011
5010--RI--MMRP Accident Prevention Plan--NOV 2011
5011--RI--MMRP Fence Installation Work Plan--FEB 2012
5013--RI--MMRP EE/CA Work Plan for the HSAR--MAY 2012
5014--RI--MMRP EE/CA for the HSAR--APR 2013
5014.1--RI--MMRP Action Memo for the HSAR--OCT 2013
502--RI—Executive Summary Uniform Federal Policy-Quality Assurance Project Plan Packet 1—DEC 2017
5034--RI—Site-specific Worksheets for Operable Unit 5 of the Uniform Federal Policy-Quality Assurance Project Plan Packet 2—APR 2018
Feasibility Study (FS)
5012--FS--MMRP FS Amendment--NOV 2012
Proposed Plan (PP)
5015--PP--Proposed Plan Public Meeting Notice--APR 2013
5016--PP--MMRP Proposed Plan Public Meeting Minutes for the HSAR EE/CA--MAY 2013
5017--PP--MMRP Proposed Plan--MAY 2013
5038--PP--MMRP Revised Proposed Plan--DEC 2022
5039--PP--MMRP Revised Proposed Plan Public Meeting Notice--JAN 2023
5043--PP--MMRP Final-Revised-Proposed-Plan-JUL 2024
Decision Documents (DD)
5018--DD--MMRP Record of Decision--SEP 2014
5044--DD--MMRP Record of Decision Amendment 1--JUL 2024
Remedial Design/Remedial Action (RD/RA)
5019--RA--After Action Report Fencing Inspection--May 2015 PDS & InDA July 2015
5020--RD--Removal Action Work Plan for HSAR--Sep 2015
5021--RA--After Action Report Fencing of PDS & InDA MRS's--Feb 2013
502--RD--Fencing Maintenance Plan PDS & InDA MRSs--Aug 2015
5023--RD--Work Plan for Remedial Action at the PDS--Feb 2016
5024--RD--Work Plan for Fence Install at the CTA & L6 Ammo Production--Jun 2016)
5025--RA--After-Action Report Fence Install at the CTA & LL6--Apr 2017
5027--RA--Remedial Action Completion Report for the Possible Demolition Site--June 2017
2028--RA--After Action Report HSAR--Aug 2017
5029--RA--After Action Report Fencing Inspection, Construction of Access pathway, and Fence Repair for PDS & InDA--Aug 2017
5031--RD--Work Plan for Maintenance Path Construction at the PDS--OCT 2017
5037--RA--Fencing After Action Report at the PDS--MAY 2022
Long-Term Management (LTM)
--LTM--OU5 Land Use Controls Implementation Plan (LUCIP)--2017
5026--LTM--2017 Annual Land Use Controls Implementation Report (LUCIR)--JULY 2017
5032--LTM--2018 Annual LUCIR--JUN 2018
5033--LTM--Site-Specific Report Long-Term Maintenance Path Construction for PDS--JUN 2018
5035--LTM--2020 Annual LUCIR--SEP 2020
5036--LTM--2021 Annual LUCIR--JUL 2021
5040--LTM--2022 Annual LUCIR--SEP 2022
5045--LTM--OU5 LUCIP--AUG 2024
5046--LTM--OU5 LUCIR FY23-FY24--NOV24
1--ALL--Federal Facilities Agreement--SEP1990
2.0--ALL--Community Relations Plan--MAY1991
2.1--ALL--Community Relations Plan Update--FEB2001
2.2--ALL--Community Involvement Plan Addendum FUSRAP Areas--FEB2011
2.3--ALL--Community Relations Plan Update--SEP2011
2.4--ALL--Community Involvement Plan--MAY2017
3--ALL--ATSDR Public Health Assessment Note of Explanation--DEC1999
4--ALL--ATSDR Health Consultation Note of Explanation--MAR2001
5--ALL--ATSDR Health Consultation Environmental Pathway Evaluation--DEC2003
Preliminary Assessment (PA)
101--PA--Pollution Investigation for Pinkwater Lagoon, Line 6 and Line 4A 1of2--SEP1981
101--PA--Pollution Investigation for the Pinkwater Lagoon, Line 6 and Line 4A 2of2--SEP1981
102--PA--Contamination Geo-technical Reports--SEP1982
102--PA--Appendices
103--PA--Underground Pollution Investigation--FEB1982
104--PA--Subsurface Investigation at Site Z-1 (Abandoned Pink Water Lagoon)--FEB1982
105--PA--Follow-on Study of Environmental Contamination--AUG1984
6000--PA--Groundwater QA Plan for the IDA and Line 6--JUN1985
107--PA--Midwest Site Confirmation Survey Sampling--AUG1986
6001--PA--Sampling and Analysis Plan-Quality Control-Quality Assurance Plan for the IDA and Line 6 Groundwater--MAR1988
6002--PA--Groundwater Quality Assessment for the IDA and Line 6 Areas 1of2--DEC1989
6002--PA--Groundwater Quality Assessment for the IDA and Line 6 Areas 2of2--DEC1989
108--PA--Potential Areas Concern Supplement--MAY1991
109--PA--News Release--AUG1991
110--PA--Conceptual Program Plan--SEP1991
6003--PA--Monitoring Evaluation for the IDA and Line 6--JAN1992
6004--PA--Work Plan and Groundwater Quality Assessment Plan for Trench 5 and Line 6-1of2--OCT1993
6004--PA--Work Plan and Groundwater Quality Assessment Plan for Trench 5 and Line 6-2of2--OCT1993
111--PA--Technical Review Committee Minutes--MAY1993
6005--PA--Groundwater Assessment for Trench 5 and Line 6--MAY1994
6006--PA--Accelerated Groundwater Quality Assessment for the Ash Disposal Cell in Trench 5 and Line 6-1of3--OCT1994
6006--PA--Accelerated Groundwater Quality Assessment for the Ash Disposal Cell in Trench 5 and Line 6-2of3--OCT1994
6006--PA--Accelerated Groundwater Quality Assessment for the Ash Disposal Cell in Trench 5 and Line 6-3of3--OCT1994
112--PA--Preliminary Assessments for 43 IAAAP Sites--OCT1994
Site Inspection (SI)
200--SI--Sampling and Analysis Plan Vol 2 Field Sampling Plan--JUN1991
201--SI--Sampling and Analysis Plan Vol 1 Quality Assurance Project Plan--JUL1991
202--SI--Site Inspection--JUN1992
203--SI--Preliminary Site Characterization Reports--MAR1993
204--SI--Site Characterization Report R01--MAR1993
205--SI--Site Characterization Report R02 R03--MAR1993
206--SI--Site Characterization Report R04-R11--MAR1993
207--SI--Site Characterization Report R12-R21--MAR1993
208--SI--Site Characterization Report R22-R30--MAR1993
6006.1--SI--Acute and Chronic Toxicity Tests-1of2--APR1993
6006.1--SI--Acute and Chronic Toxicity Tests-2of2--APR1993
6007--SI--Basewide Analytes and Drilling Procedures--MAY1993
Remedial Investigation (RI)
300--RI--Endangerment Assessment Former Line 1 Impoundment and Line 800 Pinkwater Lagoon-1of2--JUL1989
300--RI--Endangerment Assessment Former Line 1 Impoundment and Line 800 Pinkwater Lagoon-2of2--JUL1989
301--RI--Risk Assessment Protocol for the RI/FS--OCT1992
302--RI--BHHERA for the Former Line 1 Impoundment and Line 800 Pinkwater Lagoon-1--JUN1994
302--RI--BHHERA for the Former Line 1 Impoundment and Line 800 Pinkwater Lagoon-2--JUN1994
6008--RI--Project Summary Report Technical Data Report for GW Monitoring--1of4-1995
6008--RI--Project Summary Report Technical Data Report for GW Monitoring--2of4-1995
6008--RI--Project Summary Report Technical Data Report for GW Monitoring--3of4-1995
6008--RI--Project Summary Report Technical Data Report for GW Monitoring--4of4-1995
303--RI--Field Sampling Plan Addendum--MAR1995
6009--RI--Fall 1995 Monitoring of IRP Wells--MAR1996
306--RI--Risk Assessment--MAY1996
6010--RI--Spring 1996 Monitoring of IRP Wells--SEP1996
308--RI--Explosives Removal from Groundwater Inflow through Systems Planted with Aquatic and Wetland Plants--DEC1996
309--RI--Screening of Aquatic and Wetland Plant Species for Phytoremediation of Explosives--JAN1997
6011--RI--Site Groundwater Investigation Fire Training Pit Work Plan and Sampling and Analysis Plan 1of2--APR1997
6011--RI--Site Groundwater Investigation Fire Training Pit Work Plan and Sampling and Analysis Plan 2of2--APR1997
310--RI--Multiple Removal Actions Transmittal of Radioactive Isotope Analytical Report--MAY1997
6012--RI--1996-1997 Monitoring of IRP Wells--AUG1997
6013--RI-1997 Monitoring of IRP Wells--SEP1997
313--RI--Quality Control Summary Report - Supplemental Groundwater RI--JAN1998
314--RI Multiple Removal Actions - Water Treatment Plant for Perched Water at the IDA--FEB1998
316--RI--Work Plan and Sampling and Analysis Plan - Supplemental RI Line 800 Pinkwater Lagoon--AUG1998
317--RI-Quality Control Summary Report - Supplemental RI Line 800 Pinkwater Lagoon--FEB1999
318--RI-Analytical Data Report - Supplemental Groundwater RI Line 800 Pinkwater Lagoon 1of2--MAR1999
318--RI-Analytical Data Report - Supplemental Groundwater RI Line 800 Pinkwater Lagoon 2of2--MAR1999
319--RI--Recommendations for Additional RI Line 800 Pinkwater Lagoon--MAY1999
320--RI--Work Plan Addendum - Supplemental RI Line 800 Pinkwater Lagoon--SEP1999
321--RI--Long Term Monitoring Event Fall 1999-Spring 2000 Work Plan Addendum--NOV1999
323--RI--Long Term Monitoring Event Spring 2000 Work Plan Addendum--APRapr2000
6014--RI--Fall 1999 Long Term Monitoring Report--JUN2000
6015--RI-Quality Control Summary Report Fall 1999 Groundwater Monitoring Sampling Event 1of2--JUL2000
6015--RI-Quality Control Summary Report Fall 1999 Groundwater Monitoring Sampling Event 2of2--JUL2000
328--RI--Technical Memorandum Evaluation of Contaminant Sources to Surface Streams--JUL2001
6016--RI--Spring 2000 Groundwater Monitoring Report--OCT2000
6017--RI--Fall 2000 Groundwater Monitoring Results Summary--APR2001
6018--RI-Spring 2001 Groundwater Monitoring Work Plan Addendum--MAY2001
329--RI--Supplemental RI Report Line 800 Pinkwater Lagoon 1of3--JUL2001
329--RI--Supplemental RI Report Line 800 Pinkwater Lagoon 2of3--JUL2001
329--RI--Supplemental RI Report Line 800 Pinkwater Lagoon 3of3--JUL2001
331--RI--Quality Control Summary Report Groundwater Monitoring Program Spring 2000 Sampling Event 1of2--AUG2001
331--RI--Quality Control Summary Report Groundwater Monitoring Program Spring 2000 Sampling Event 2of2--AUG2001
334--RI--Supplemental Groundwater RI 1of5--AUG2001
334--RI--Supplemental Groundwater RI 2of5--AUG2001
334--RI--Supplemental Groundwater RI 3of5--AUG2001
334--RI--Supplemental Groundwater RI 4of5--AUG2001
334--RI--Supplemental Groundwater RI 5of5--AUG2001
335--RI--Groundwater Monitoring Program--AUG2001
336--RI--Fall 2000-Spring 2001 Groundwater Monitoring Results Summary--AUG2001
339--RI--AO Construction Projects Sampling Work Plan 1of2--JAN2002
339--RI--AO Construction Projects Sampling Work Plan 2of2--JAN2002
340--RI--Facility Wide Work Plan for Groundwater--FEB2002
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 1of6--FEB2002
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 2of6--FEB2002.
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 3of6--FEB2002
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 4of6--FEB2002
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 5of6--FEB2002
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 6of6--FEB2002
6019--RI--Spring 2002 Groundwater Monitoring Work Plan Addendum--MAY2002
6020--RI-Initial Groundwater Analytical Results and Monitoring Well Locations Six Sites FS Data Collection 1of2--FEB2003
6020--RI-Initial Groundwater Analytical Results and Monitoring Well Locations Six Sites FS Data Collection 2of2--FEB2003
347--RI--2002 Groundwater Monitoring Report 1of5--AUG2003
347--RI--2002 Groundwater Monitoring Report 2of5--AUG2003
347--RI--2002 Groundwater Monitoring Report 3of5--AUG2003
347--RI--2002 Groundwater Monitoring Report 4of5--AUG2003
347--RI--2002 Groundwater Monitoring Report 5of5--AUG2003
6021--RI--Initial Groundwater Analytical Results Six Sites FS Data Collection 1of2--SEP2003
6021--RI--Initial Groundwater Analytical Results Six Sites FS Data Collection 2of2--SEP2003
351--RI--2003 Groundwater Monitoring Report 1of5--DEC2004
351--RI--2003 Groundwater Monitoring Report 2of5--DEC2004
351--RI--2003 Groundwater Monitoring Report 3of5--DEC2004
351--RI--2003 Groundwater Monitoring Report 4of5--DEC2004
351--RI--2003 Groundwater Monitoring Report 5of5--DEC2004
354--RI--2004 Groundwater Monitoring Report 1of4--JUL2005
354--RI--2004 Groundwater Monitoring Report 2of4--JUL2005
354--RI--2004 Groundwater Monitoring Report 3of4--JUL2005
354--RI--2004 Groundwater Monitoring Report 4of4--JUL2005
355--RI--2004-2005 Groundwater Sampling Report 1of5--DEC2005
355--RI--2004-2005 Groundwater Sampling Report 2of5--DEC2005
355--RI--2004-2005 Groundwater Sampling Report 3of5--DEC2005
355--RI--2004-2005 Groundwater Sampling Report 4of5--DEC2005
355--RI--2004-2005 Groundwater Sampling Report 5of5--DEC2005
357.1--RI--Brush Creek SW and Sediment Investigation Work Plan--FEB2006
357--RI--Comprehensive Watersheds Evaluation Work Plan 1of3--DEC2006
357--RI--Comprehensive Watersheds Evaluation Work Plan 2of3--DEC2006
357--RI--Comprehensive Watersheds Evaluation Work Plan 3of3--DEC2006
6022--RI--Concentration Trends for Selected Wells and Parameters--AUG2007
358--RI--2006 Groundwater Sampling Report 1of3--FEB2009
358--RI--2006 Groundwater Sampling Report 2of3--FEB2009
358--RI--2006 Groundwater Sampling Report 3of3--FEB2009
359--RI--2007 Groundwater Sampling Report--FEB2009
6023--RI--On-site Groundwater Treatability Study Tech Memo--FEB2009
6023.1--RI--Work Plan for Supplemental RI of GW and SW at Line 1, and Field Modification 1of6--MAY2011
6023.1--RI--Work Plan for Supplemental RI of GW and SW at Line 1, and Field Modification 2of6--MAY2011
6023.1--RI--Work Plan for Supplemental RI of GW and SW at Line 1, and Field Modification 3of6--MAY2011
6023.1--RI--Work Plan for Supplemental RI of GW and SW at Line 1, and Field Modification 4of6--MAY2011
6023.1--RI--Work Plan for Supplemental RI of GW and SW at Line 1, and Field Modification 5of6--MAY2011
6023.1--RI--Work Plan for Supplemental RI of GW and SW at Line 1, and Field Modification 6of6--MAY2011
6023.3--RI-Tech Memo and Work Plan Addendum for Line 1 Groundwater and SW 1of2--OCT2012
6023.3--RI--Tech Memo and Work Plan Addendum for Line 1 Groundwater and SW 2of2--OCT2012
502--RI—Executive Summary Uniform Federal Policy-Quality Assurance Project Plan Packet 1—DEC2017
6036--RI—Site-specific Worksheets for Operable Unit 6 of the Uniform Federal Policy-Quality Assurance Project Plan Packet 1—DEC2017
6037--RI—Site-specific Worksheets for Operable Unit 6 of the Uniform Federal Policy-Quality Assurance Project Plan Packet 2—APR2018
6038--RI—Site-specific Worksheets for Operable Unit 6 of the Uniform Federal Policy-Quality Assurance Project Plan Packet 3—JUL2018
6039--RI—Site-specific Worksheets for Watersheds of the Uniform Federal Policy-Quality Assurance Project Plan Packet 3—JUL2018
6040--RI—Site-Specific Worksheets for Operable Unit 6 of the Uniform Federal Policy-Quality Assurance Project Plan Packet 4—JAN2019
6041--RI—Iron Bioreactor Treatability Study—APR2019
6042--RI—Iron Bioreactor Treatability Study and Experiment Basis of Design—AUG2019
6043--RI—Iron Bioreactor Treatability Test Design—FEB2020
6044--RI--Iron Bioreactor Treatability Test Completion Report--JUL2021
6045--RI--OU-6 Remedial Investigation Report--AUG2023
Feasibility Study (FS)
401--FS--Groundwater Feasibility Study Report--DEC1997
403--FS--Interim Groundwater Feasibility Study Report-1of2--AUG1998
403--FS--Interim Groundwater Feasibility Study Report-2of2--AUG1998
404--FS--Evaluation of Natural Attenuation--OCT1999
6024--FS--Fire Training Pit, West Burn Pads Area, and East Burn Pads Area FS Data Collection Work Plan Add--OCT2002
6025--FS--Lines 2, 3 and 9 FS Data Collection Work Plan--OCT2002
405--FS--Line 800 Pinkwater Lagoon FS--FEB2003
6026--FS--Line 3 Groundwater Remedial Alternatives Analysis 1of2--JAN2004
6026--FS--Line 3 Groundwater Remedial Alternatives Analysis 2of2--JAN2004
6027--FS--Line 9 Groundwater Remedial Alternatives Analysis 1of2--JAN2004
6027--FS--Line 9 Groundwater Remedial Alternatives Analysis 2of2--JAN2004
6028--FS--Line 2 Groundwater Remedial Alternatives Analysis 1of3--FEB2004
6028--FS--Line 2 Groundwater Remedial Alternatives Analysis 2of3--FEB2004
6028--FS--Line 2 Groundwater Remedial Alternatives Analysis 3of3--FEB2004
6029--FS--Fire Training Pit Groundwater Remedial Alternatives Analysis 1of2--MAY2004
6029--FS--Fire Training Pit Groundwater Remedial Alternatives Analysis 2of2--MAY2004
6030--FS--East Burning Pads Groundwater Remedial Alternatives Analysis 1of2--JUN2004
6030--FS--East Burning Pads Groundwater Remedial Alternatives Analysis 2of2--JUN2004
6031--FS--West Burn Pads Groundwater Investigation 1of2--JUN2004
6031--FS--West Burn Pads Groundwater Investigation 2of2--JUN2004
6032--FS--Treatability Study Test Plan for In-Situ Bio-gradation of On-Post Groundwater--APR2005
1--ALL--Federal Facilities Agreement--SEP1990
2.0--ALL--Community Relations Plan--MAY1991
2.1--ALL--Community Relations Plan Update--FEB2001
2.2--ALL--Community Involvement Plan Addendum FUSRAP Areas--FEB2011
2.3--ALL--Community Relations Plan Update--SEP2011
2.4--ALL--Community Involvement Plan--MAY2017
3--ALL--ATSDR Public Health Assessment Note of Explanation--DEC1999
4--ALL--ATSDR Health Consultation Note of Explanation--MAR2001
5--ALL--ATSDR Health Consultation Environmental Pathway Evaluation--DEC2003
Preliminary Assessment (PA)
100--PA--Installation Assessment--JAN1980
101--PA--Pollution Investigation for Pinkwater Lagoon, Line 6 and Line 4A 1of2--SEP1981
101--PA--Pollution Investigation for the Pinkwater Lagoon, Line 6 and Line 4A 2of2--SEP1981
102--PA--Contamination Geo-technical Reports--SEP1982
102--PA--Appendices
103--PA--Underground Pollution Investigation--FEB1982
104--PA--Subsurface Investigation at Site Z-1 (Abandoned Pink Water Lagoon)--FEB1982
105--PA--Follow-on Study of Environmental Contamination--AUG1984
107--PA--Midwest Site Confirmation Survey Sampling--AUG1986
108--PA--Potential Areas Concern Supplement--MAY1991
109--PA--News Release--AUG1991
110--PA--Conceptual Program Plan--SEP1991
111--PA--Technical Review Committee Minutes--MAY1993
112--PA--Preliminary Assessments for 43 IAAAP Sites--OCT1994
113--PA--Installation Environmental Assessment--OCT1995
Site Inspections (SI)
200--SI--Sampling and Analysis Plan Vol 2 Field Sampling Plan--JUN1991
201--SI--Sampling and Analysis Plan Vol 1 Quality Assurance Project Plan--JUL1991
2002--SI--Site Inspection--JUN1992
203--SI--Preliminary Site Characterization Reports--MAR1993
204--SI--Site Characterization Report R01--MAR1993
205--SI--Site Characterization Report R02 R03--MAR1993
206--SI--Site Characterization Report R04-R11--MAR1993
207--SI--Site Characterization Report R12-R21--MAR1993
208--SI--Site Characterization Report R22-R30--MAR1993
209--SI--Site Assessment Project Plans--JUN2000
210--SI--Field Sampling Report--FEB2001
211--SI-Historical Record Review for Line 6, Line 800, Central Test Area and Deactivation Furnance-1of7--SEP2004
211--SI-Historical Record Review for Line 6, Line 800, Central Test Area and Deactivation Furnance-2of7--SEP2004
211--SI-Historical Record Review for Line 6, Line 800, Central Test Area and Deactivation Furnance-3of7--SEP2004
211--SI-Historical Record Review for Line 6, Line 800, Central Test Area and Deactivation Furnance-4of7--SEP2004
211--SI-Historical Record Review for Line 6, Line 800, Central Test Area and Deactivation Furnance-5of7--SEP2004
211--SI-Historical Record Review for Line 6, Line 800, Central Test Area and Deactivation Furnance-6of7--SEP2004
211--SI-Historical Record Review for Line 6, Line 800, Central Test Area and Deactivation Furnance-7of7--SEP2004
Remedial Investigations (RI)
301--RI--Risk Assessment Protocol for the RI/FS--OCT1992
302--RI--BHHERA for the Former Line 1 Impoundment and Line 800 Pinkwater Lagoon-1--JUN1994
302--RI--BHHERA for the Former Line 1 Impoundment and Line 800 Pinkwater Lagoon-2--JUN1994
303--RI--Field Sampling Plan Addendum--MAR1995
7007--RI--Field Investigation Report for Former Line 1 Impoundment and Line 800 Pink Water Lagoon Sampling--APR1995
7008--RI--Final Work Plan - Rapid Response Interim Removal Actions at the Pesticide Pit and Sumps--APR1995
7009--RI--Sampling and Analysis Plan for Rapid Response Interim Removal Actions at the Pesticide Pit and Explosive Contaminated Sumps--APR1995
304--RI--Engineering Evaluation/Cost Analysis for Three Removal Actions-1of2--MAY1995
304--RI--Engineering Evaluation/Cost Analysis for Three Removal Actions-2of2--MAY1995
305--RI--Implementation Proposal for Environmental Protection--FEB1996
7011--RI--Engineering Evaluation/Cost Analysis Study for the Fire Training Pit--MAY1996
306--RI--Risk Assessment--MAY1996
307--RI--Work Plan for Multiple Removal Actions at Line 1 Impoundment, Line 800 Lagoon and the Inert Disposal Area--AUG1996
7012--RI--Sampling and Analysis Plan for Treated Discharges of the Water Contained in the Line 800 Pink Water Lagoon--AUG1996
7013--RI--Wetland Borrow Assessment Report--AUG1996
7014--RI--Final Report Addendum for Transportation and Disposal and Other Activities at the Pesticide Pit and Explosive Contaminated Sumps--NOV1996
308--RI--Explosives Removal from Groundwater Inflow through Systems Planted with Aquatic and Wetland Plants--DEC1996
309--RI--Screening of Aquatic and Wetland Plant Species for Phytoremediation of Explosives--JAN1997
310--RI--Multiple Removal Actions Transmittal of Radioactive Isotope Analytical Report--MAY1997
311--RI--Work QA Plan Eco Risk Assessment Addendum--JUL1997
312--RI--Multiple Removal Actions - Construction Progress Photo--SEP1997
314--RI Multiple Removal Actions - Water Treatment Plant for Perched Water at the IDA--FEB1998
315--RI--Historical Eco Risk Assessment Addendum--MAR1998
7015--RI--Site Monitoring Reports for the Former Fuel Station--JUL1998
7016--RI--Final Work Plan, Final Sampling and Analysis Plan Addendum, Final Site Safety and Health Plan Addendum for the Fire Training Pit--JUL1998
316--RI--Work Plan and Sampling and Analysis Plan - Supplemental RI Line 800 Pinkwater Lagoon--AUG1998
317--RI-Quality Control Summary Report - Supplemental RI Line 800 Pinkwater Lagoon--FEB1999
7017--RI--Line 1 and 800 Phytoremediation Monitoring--FEB1999 and Phyoremediation Results--FALL1997
318--RI-Analytical Data Report - Supplemental Groundwater RI Line 800 Pinkwater Lagoon 1of2--MAR1999
318--RI-Analytical Data Report - Supplemental Groundwater RI Line 800 Pinkwater Lagoon 2of2--MAR1999
319--RI--Recommendations for Additional RI Line 800 Pinkwater Lagoon--MAY1999
320--RI--Work Plan Addendum - Supplemental RI Line 800 Pinkwater Lagoon--SEP1999
7018--RI--Site Monitoring Reports for the Former Fuel Station--JAN2000
324--RI--Modification to the SAP Eco Assessment--APR2000
7019--RI--Revised RBCA Tier 2 Report--MAY2000
325--RI--Eco Risk Round 2 Sampling--SEP2000
7020--RI--Site Monitoring Reports for the Former Fuel Station--NOV2000
7021--RI--Site monitoring Report for Former Fuel Station--DEC2000
327--RI--Eco Risk Assessment Screening Level--APR2001
329--RI--Supplemental RI Report Line 800 Pinkwater Lagoon 1of3--JUL2001
329--RI--Supplemental RI Report Line 800 Pinkwater Lagoon 2of3--JUL2001
329--RI--Supplemental RI Report Line 800 Pinkwater Lagoon 3of3--JUL2001
331--RI--Quality Control Summary Report Groundwater Monitoring Program Spring 2000 Sampling Event 1of2--AUG2001
331--RI--Quality Control Summary Report Groundwater Monitoring Program Spring 2000 Sampling Event 2of2--AUG2001
333--RI--Screening Level Risk Assessment Eco (Text - Appendix A)--AUG2001
333--RI--Screening Level Risk Assessment Eco (Appendix B-J)--AUG2001
338--RI--Addendum to Screening Level Risk Assessment Ecological--DEC2001
339--RI--AO Construction Projects Sampling Work Plan 1of2--JAN2002
339--RI--AO Construction Projects Sampling Work Plan 2of2--JAN2002
342--RI--Technical Memorandums Numbers 1-4 for the Ecological Risk Assessment--APR2002
344--RI--Aerial Radiation Survey Work Plan--OCT2002
345--RI--Line 800 Pinkwater Lagoon Groundwater Flow and Contaminant Flow and Trans Modeling Tech Memo--FEB2003
346--RI--Aerial Radiological Survey--JUL2003
7022--RI--Supplemental Work Plan for the Fire Training Pit Removal Action--AUG2003
7023--RI--Report for the Investigation of the Tar-Like Substance Piles--SEP2003
7024--RI--Sampling and Reconnaissance of Brush Creek--JAN2004
348--RI--Work Plan for UXO Survey at Line 6 and Central Test Area 1-of-3--MAY2004
348--RI--Work Plan for UXO Survey at Line 6 and Central Test Area 2-of-3--MAY2004
348--RI--Work Plan for UXO Survey at Line 6 and Central Test Area 3-of-3--MAY2004
349--RI--Technical Memo 5 BERA--JUL2004
349.1--RI--Soil Data Collection Work Plan 1of2--JUL2004
349.1--RI--Soil Data Collection Work Plan 2of2--JUL2004
350--RI--BERA Vol I and II 1of2--OCT2004
350--RI--BERA Vol I and II 2of2--OCT2004
352--RI--Line 6 and Central Test Area Mec Density Survey Report 1of2--MAY2005
352--RI--Line 6 and Central Test Area Mec Density Survey Report 2of2--MAY2005
353--RI--Soil Data Collection Report 1of6--MAY2005
353--RI--Soil Data Collection Report 2of6--MAY2005
353--RI--Soil Data Collection Report 3of6--MAY2005
353--RI--Soil Data Collection Report 4of6--MAY2005
353--RI--Soil Data Collection Report 5of6--MAY2005
353--RI--Soil Data Collection Report 6of6--MAY2005
356--RI--Supplemental RI Work Plan 1of4--MAY2006
356--RI--Supplemental RI Work Plan 2of4--MAY2006
356--RI--Supplemental RI Work Plan 3of4--MAY2006
356--RI--Supplemental RI Work Plan 4of4--MAY2006
357.1--RI--Brush Creek Surface Water and Sediment Investigation Work Plan--FEB2006
357--RI--Comprehensive Watersheds Evaluation Work Plan 1of2--DEC2006
357--RI--Comprehensive Watersheds Evaluation Work Plan 2of2--DEC2006
7025--RI--Progress Report for Brush Creek--JUL2008
7025--RI--Supplemental Remedial Investigation Rev 3 (Text)--AUG2011
502--RI—Executive Summary Uniform Federal Policy-Quality Assurance Project Plan Packet 1—DEC2017
7044--RI—Site-specific Worksheets for Operable Unit 7 of the Uniform Federal Policy-Quality Assurance Project Plan Packet 2—APR2018
Feasibility Study (FS)
7026--FS--Former Line 1 Impoundment and Line 800 Pink Water Lagoon Feasibility Study-1of4--JUN1994
7026--FS--Former Line 1 Impoundment and Line 800 Pink Water Lagoon Feasibility Study-2of4--JUN1994
7026--FS--Former Line 1 Impoundment and Line 800 Pink Water Lagoon Feasibility Study-3of4--JUN1994
7026--FS--Former Line 1 Impoundment and Line 800 Pink Water Lagoon Feasibility Study-4of4--JUN1994
7027--FS--Evaluation of Treatment Alternatives for Line 1 Impoundment and Line 800 Pink Water Lagoon--JUN1995
7028--FS--Bench Scale Composting Investigation for Line 1 Impoundment and Line 800 Pink Water Lagoon--NOV1997
404--FS--Evaluation of Natural Attenuation--OCT1999
7029--FS--Options for Corrective Action Design Report for Former Fuel Station--JUL2001
405--FS--Line 800 Pinkwater Lagoon FS--FEB2003
7030--FS--Brush Creek Point Source Control Work Plan-1of2--NOV2004
7030--FS--Brush Creek Point Source Control Work Plan-2of2--NOV2004
7031--FS--Brush Creek Point Source Control Treatment System Design (Text)--MAY2005
7032--FS--Technical Memorandum Cesium Source Evaluation--FEB2009
7033--FS--Brush Creek Point Source Control Treatment System Report--JUN2009
7033.1--FS--Work Plan for Feasibility Study Supplemental Data Collection--JUL2013
The Formerly Utilized Sites Remedial Action Program (FUSRAP) has the mission of protecting public health and the environment by removing low-level radioactive contamination generated by activities of the Manhattan Engineer District and the Atomic Energy Commission (MED/AEC) during the development of atomic weapons in the 1940s and 1950s. FUSRAP has a separate Federal Facility Agreement Under CERCLA Section 120, Administrative Docket Number: CERCLA-07-2005-0378.
http://www.mvs.usace.army.mil/Missions/Centers-of-Expertise/Formerly-Utilized-Sites-Remedial-Action-Program/Iowa-FUSRAP-Administrative-Record/
1--ALL--Federal Facilities Agreement--SEP1990
2.0--ALL--Community Relations Plan--MAY1991
2.1--ALL--Community Relations Plan Update--FEB2001
2.2--ALL--Community Involvement Plan Addendum FUSRAP Areas--FEB2011
2.3--ALL--Community Relations Plan Update--SEP2011
2.4--ALL--Community Involvement Plan--MAY2017
3--ALL--ATSDR Public Health Assessment Note of Explanation--DEC1999
4--ALL--ATSDR Health Consultation Note of Explanation--MAR2001
5--ALL--ATSDR Health Consultation Environmental Pathway Evaluation--DEC2003
Remedial Investigation (RI)
9000--RI-Remedial Investigation Work Plan for Construction Debris Sites--MAY2013
9001--RI--Remedial Investigation for Construction Debris Sites VOLUME 1--MAR2014
9001--RI--Remedial Investigation for Construction Debris Sites VOLUME II (1of3)--MAR2014
9001--RI--Remedial Investigation for Construction Debris Sites VOLUME II (2of3)--MAR2014
9001--RI--Remedial Investigation for Construction Debris Sites VOLUME II (3of3)--MAR2014
502--RI—Executive Summary Uniform Federal Policy-Quality Assurance Project Plan Packet 1—DEC2017
9007--RI—Site-specific Worksheets for Operable Unit 9 of the Uniform Federal Policy-Quality Assurance Project Plan Packet 1—DEC2017
9008--RI—OU9 Remedial Investigation Report Addendum—NOV2020
Feasibility Study (FS)
9002--FS--OU9 Focused Feasibility Study--AUG2014
9009--FS--OU9 Feasibility Study Addendum--MAY2022
Proposed Plan (PP)
9003--PP--2015 OU9 Proposed Plan--JAN2015
9004--PP--2015 OU9 Proposed Plan Public Notice --JAN2015
9005--PP--2015 Public Meeting Minutes for OU9 Proposed Plan--FEB2015
9010--PP--2023 Revised OU9 Proposed Plan
9011--PP--2023 Revised OU9 Proposed Plan Public Notice
Decision Documents (DD)
1--ALL--Federal Facilities Agreement--SEP1990
2.0--ALL--Community Relations Plan--MAY1991
2.1--ALL--Community Relations Plan Update--FEB2001
2.2--ALL--Community Involvement Plan Addendum FUSRAP Areas--FEB2011
2.3--ALL--Community Relations Plan Update--SEP2011
2.4--ALL--Community Involvement Plan--MAY2017
3--ALL--ATSDR Public Health Assessment Note of Explanation--DEC1999
4--ALL--ATSDR Health Consultation Note of Explanation--MAR2001
5--ALL--ATSDR Health Consultation Environmental Pathway Evaluation--DEC2003
Remedial Investigation (RI)
6037--R--Site-specific Worksheets for OU-6 of the UFP-QAPP Packet 2 (Includes OU-10)--APR2018
10000--RI--Remedial Investigation for OU-10 (Explosive Disposal Areas) 1of2--NOV2023
10000--RI--Remedial Investigation for OU-10 (Explosive Disposal Areas) 2of2--NOV2023
1--ALL--Federal Facilities Agreement--SEP1990
2.0--ALL--Community Relations Plan--MAY1991
2.1--ALL--Community Relations Plan Update--FEB2001
2.2--ALL--Community Involvement Plan Addendum FUSRAP Areas--FEB2011
2.3--ALL--Community Relations Plan Update--SEP2011
2.4--ALL--Community Involvement Plan--MAY2017
3--ALL--ATSDR Public Health Assessment Note of Explanation--DEC1999
4--ALL--ATSDR Health Consultation Note of Explanation--MAR2001
5--ALL--ATSDR Health Consultation Environmental Pathway Evaluation--DEC2003
Remedial Investigation (RI)
11000--RI--Remedial Investigation Report for Operable Unit 11--AUG2021
11001--RI--Supplemental Remedial Investigation for Operable Unit 11 for Line 6
1--ALL--Federal Facilities Agreement--SEP1990
2.0--ALL--Community Relations Plan--MAY1991
2.1--ALL--Community Relations Plan Update--FEB2001
2.2--ALL--Community Involvement Plan Addendum FUSRAP Areas--FEB2011
2.3--ALL--Community Relations Plan Update--SEP2011
2.4--ALL--Community Involvement Plan--MAY2017
3--ALL--ATSDR Public Health Assessment Note of Explanation--DEC1999
4--ALL--ATSDR Health Consultation Note of Explanation--MAR2001
5--ALL--ATSDR Health Consultation Environmental Pathway Evaluation--DEC2003
Remedial Investigation (RI)
12000--RI--Phase 1 Remedial Investigation Report for Operable Unit 12--AUG2021
Preliminary Assessment (PA)
13000--PA--PFAS Preliminary Assessment--OCT2020
Site Inspections (SI)
13001--SI--UFP-QAPP Site Inspection for PFAS--OCT2020
13002--SI--Site Inspection Report for PFAS--DEC2022
13003--SI--UFP-QAPP Addendum Site Inspection for PFAS at the Current Fire Station--JUN2023
13004--SI--Site Inspection Addendum Report for PFAS at the Current Fire Station--DEC2022
13005--SI--Site Inspection Addendum for PFAS--NOV2024
Remedial Investigations (RI)
TNT Cave Complex - Operable Unit Not Assigned
Preliminary Assessment (PA)
7038--PA--Work Plan for TNT Cave Complex Preliminary Assessment--MAR2016
7039--PA--TNT Cave Complex Preliminary Assessment--SEP2017
Site Inspections (SI)
7041--SI—Uniform Federal Policy - Quality Assurance Project Plan TNT Cave Complex Site Inspection--OCT 2018
7042--SI—Site Inspection Report for the TNT Cave Complex--JUN2019
#
Mathes Lake Investigation - Operable Unit Not Assigned
Preliminary Assessment (PA)
7036--PA--Work Plan for Mathes Lake Preliminary Assessment--APR2015
7037--PA--Preliminary Assessment for Mathes Lake 1of2--JAN2016
7037--PA--Preliminary Assessment for Mathes Lake 2of2--JAN2016
Site Inspections (SI)
7040--SI—Uniform Federal Policy – Quality Assurance Project Plan for a Site Inspection at Mathes Lake—AUG2018
7043--SI—Site Inspection Report for Mathes Lake—DEC2019
#
Fourth Five-Year Review Report 2021
720--5YR--Final2021-5YR-MAR2021
Third Five-Year Review Report 2016
719--5YR--Final2015-5YR-1of4--MAR2016
719--5YR--Final2015-5YR-2of4--MAR2016
719--5YR--Final2015-5YR-3of4--MAR2016
719--5YR--Final2015-5YR-4of4--MAR2016
Second Five-Year Review Report 2011
711--5YR--Final20105YR-1of5--APR2011
711--5YR--Final20105YR-2of5--APR2011
711--5YR--Final20105YR-3of5--APR2011
711--5YR--Final20105YR-4of5--APR2011
711--5YR--Final20105YR-5of5--APR2011
First Five-Year Review Report 2006
707--5YR--Final2005-5YR-1of4--MAR2006
707--5YR--Final2005-5YR-2of4--MAR2006
707--5YR--Final2005-5YR-3of4--MAR2006
707--5YR--Final2005-5YR-4of4--MAR2006
8124--JAN 2024 | 8125--APR 2024 | 8126--JUL 2024 | 8127--OCT 2024
8120--JAN 2023 | 8121--APR 2023 | 8122--JUN 2023 | 8123--OCT 2023
8116--JAN 2022 | 8117--APR 2022 | 8118--JUL 2022 | 8119--OCT 2022
8112--JAN 2021 | 8113--APR 2021 | 8114--JUL 2021 | 8115--OCT 2021
8108--JAN 2020 | 8109--APR 2020 | 8110--JUL 2020 | 8111--OCT 2020
8104--JAN 2019 | 8105--APR 2019 | 8106--JUL 2019 | 8107--OCT 2019
8100--JAN 2018 | 8101--APR 2018 | 8102--JUL 2018 | 8103--OCT 2018
8096--JAN 2017 | 8097--APR 2017 | 8098--JUL 2017 | 8099--OCT 2017
8092--JAN 2016 | 8093--APR 2016 | 8094--JUL 2016 | 8095--OCT 2016
8088--JAN 2015 | 8089--APR 2015 | 8090--JUL 2015 | 8091--OCT 2015
8084--JAN 2014 | 8085--APR 2014 | 8086--JUL 2014 | 8087--OCT 2014
8080--JAN 2013 | 8081--APR 2013 | 8082--JUL 2013 | 8083--OCT 2013
8076--JAN 2012 | 8077--APR 2012 | 8078--JUL 2012 | 8079--OCT 2012
8072--JAN 2011 | 8073--APR 2011 | 8074--JUL 2011 | 8075--OCT 2011
8068--JAN 2010 | 8069--APR 2010 | 8070--JUL 2010 | 8071--OCT 2010
8065--JAN 2009 | 8066--JUL 2009 | 8067--OCT 2009
8062--JAN 2008 | 8063--APR 2008 | 8064--AUG 2008
8058--JAN 2007 | 8059--APR 2007 | 8060--JUL 2007 | 8061--OCT 2007
8053--JAN 2006 | 8054--MAR 2006 | 8055--MAY 2006 | 8056--JUL 2006 | 8057--OCT 2006
8049--JAN 2005 | 8050--MAY 2005 | 8051--AUG 2005 | 8052--OCT 2005
8044--JAN 2004 | 8045--MAR 2004 | 8046--MAY 2004 | 8047--SEP 2004 | 8048--NOV 2004
8040--MAR 2003 | 8041--MAY 2003 | 8042--AUG 2003 | 8043--NOV 2003
8035--JAN 2002 | 8036--MAR 2002 | 8037--MAY 2002 | 8038--SEP 2002 | 8039--NOV 2002
8030--JAN 2001 | 8031--MAR 2001 | 8032--MAY 2001 | 8033--AUG 2001 | 8034--NOV 2001
8024--JAN 2000 | 8025--FEB 2000 | 8026--MAR 2000 | 8027--MAY 2000 | 8028--JUL 2000 | 8029--SEP 2000
8014--JAN 1999 | 8015--FEB 1999 | 8016--MAR 1999 | 8017--APR 1999 | 8018--MAY 1999 | 8019--JUN 1999 | 8020--JUL 1999 | 8021--SEP 1999 | 8022--OCT 1999 | 8023--DEC 1999
8005--JAN 1998 | 8006--FEB 1998 | 8007--MAR 1998 | 8008--APR 1998 | 8009--MAY 1998 | 8010--JUN 1998 | 8011--JUL 1998 | 8012--AUG 1998 | 8013--SEP 1998
8000--JUN 1997 | 8001--AUG 1997 | 8002--SEP 1997 | 8003--OCT 1997 | 8004--NOV 1997